Laserfiche WebLink
• <br />4. Number of Units: Proposed: 100 units <br />5. Density.— Proposed: 2.70 units/acre <br />Maximum Allowed: 5.67 units/acre (based on RM -6 & CON -2 zoning) <br />6. Open Space: Required: 40.6%* <br />Provided: 54.9% <br />*Note. The open space requirement is a weighted average of 34.99 acres of RM -6 at 40% <br />and 2.21 acres of RS -1 at 50% open space. <br />In response to the Planning and Zoning Commission open space condition, staff had the <br />applicant provide a detailed green space calculation and exhibit. Initially, the open space <br />analysis indicated that 49.04% green space was provided, which required the applicant to <br />make some minor design changes. That information now shows that a minimum of 50% <br />green space (does not include lake area) will be provided. Including the amount of lake area <br />creditable for open space under the county's regulations, the project open space is 54.9%. <br />In the open -space analysis, the project engineer assumed the largest possible home on every <br />lot and assumed that every lot would be developed to the minimum setbacks allowed in the <br />PD zoning district. This detailed analysis shows that the project's green space is at the 50% <br />figure represented to the Planning and Zoning Commission, and is a conservative analysis <br />that assumes each lot owner builds to his setbacks and occupies the entire building envelope <br />with development. <br />7. Recreation Area: Required: 1.2 acres <br />Provided: 1.53 acres <br />Note: Recreation facilities will include a clubhouse, pool, and tennis facilities. <br />8. Stormwater Management: As with standard single-family subdivisions, the proposed <br />stormwater management plan has been given conceptual approval by the Public Works <br />Department. Final review and approval of the stormwater management plan will be <br />accomplished through the land development permit or land development permit waiver <br />Process. <br />9. Utilities: The project will be served by county water and sewer. These utility provisions <br />have been approved by the Department of Utility Services and the Environmental Health <br />Department. <br />10. Phasing: The applicant is proposing to build the improvements in a single phase. <br />11. Traffic Circulation: The project's only permanent vehicular access point will be on CR 510 <br />and align with the entrance for the Old Orchid development to the north. The internal project <br />road will branch off from the entrance at a traffic circle and then provide access to individual <br />lots within the development. The internal circulation plan has been reviewed and approved <br />by the Traffic Engineering Division. <br />In addition to the permanent access point and in coordination with staff, the applicant is <br />proposing an emergency access point to Jungle Trail. This emergency access provision is <br />acceptable to Emergency Services, Public Works, and planning staff. Through the LDP <br />process, the applicant will need to have the emergency access design approved by <br />engineering and emergency services. The emergency access point will need to be <br />constructed and inspected prior to the issuance of a certificate of completion for the project. <br />AUGUST 22, 2000 <br />-45- <br />BK1I4PG671 <br />• <br />