My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/9/2000 (2)
CBCC
>
Meetings
>
2000's
>
2000
>
5/9/2000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 2:46:06 PM
Creation date
6/16/2015 3:50:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
05/09/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />TO: James E. Chandler <br />County Administrator <br />ION HEAD CONCURRENCE: <br />0l <br />Robert M. Keating, AICP + / <br />Community Development Director <br />THROUGH: Stan Boling, ACP <br />Planning Director nf� <br />FROM: John W. McCoy, AICP'../1W111v\ <br />Senior Planner, Current Development <br />DATE: August 29, 2000 <br />SUBJECT: GHA Harbor Island, Inc.'s Request for Final Plat Approval for Harbor Island <br />Grand Harbor Plat 23 <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of September 5, 2000. <br />DESCRIPTION & CONDITIONS: <br />Harbor Island is a 14 lot subdivision of a 1.86 acre parcel located on the west side of the existing <br />harbor within the Grand Harbor project. Although the subject site has a commercial zoning and land <br />use designation [CG zoning and a C/1 (commercial/industrial), the approved PD plan for the harbor <br />area allows the proposed residential development on this site. <br />On May 27, 1999, the Planning and Zoning Commission granted preliminary PD plan/ plat approval <br />for Harbor Island. The applicant has subsequently obtained a land development permit and <br />commenced construction. Now, the applicant has completed all required improvements, is <br />requesting final plat approval, and has submitted the following: <br />1. A final plat in conformance with the approved preliminary PD plan/plat, and <br />2. A certificate of completion, and <br />3. An Engineer's Certified Cost Estimate for the remaining improvements required by <br />the project design, and <br />September 5, 2000 <br />35 <br />BK 1 14 PG 7 6 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.