Laserfiche WebLink
for handling Shop Drawings and other submittals, and maintaining required <br />records. Utility companies and others as appropriate will be requested to attend <br />to discuss and coordinate work. <br />B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br />Contractor will certify to the Engineer the following: <br />1. A listing of on-site clerical staff, supervisory personnel and their pro -rated <br />time assigned to the contract, <br />2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br />3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br />and a Retirement Plan, and, <br />4. Payment of Per Diem is a company practice for instances when <br />compensation for Per Diem is requested. <br />Such certification must be made by an officer or director of the Contractor with <br />authority to bind the Contractor. Timely certification is a condition precedent to <br />any right of the Contractor to recover compensations for such costs, and failure <br />to timely submit the certification will constitute a full, complete, absolute and <br />irrevocable waiver by the Contractor of any right to recover such costs. Any <br />subsequent changes shall be certified to the Engineer as part of the cost <br />proposal or seven calendar days in advance of performing such extra work. <br />FDOT Table 4-3.2.1 <br />Item <br />Rate <br />FICA <br />Rate established by Law <br />FUTA/SUTA <br />Rate established by Law <br />Medical Insurance <br />Actual <br />Holidays, Sick & Vacation Benefits <br />Actual <br />Retirement Benefits <br />Actual <br />Workers Compensation <br />Rates based on the National Council on <br />Compensation Insurance basic rates tables <br />adjusted by Contractor's actual experience <br />modification factor in effect at the time of the <br />additional work or unforeseen work <br />Per Diem <br />Actual but not to exceed State of Florida's rate <br />Insurance* <br />Actual <br />*Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br />insurance coverage (such as, but not limited to, Umbrella Coverage, Automobile Insurance, etc.). <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />SC -3.06 Add the following new paragraphs immediately after paragraph GC -3.05: <br />SC -3.06 Coordination of Plans, Specifications, and Special Provisions <br />A. In case of discrepancy, the governing order of the documents shall be as follows: <br />1. Written Interpretations <br />2. Addenda <br />3. Specifications <br />4. Supplementary Conditions to the General Conditions <br />5. General Conditions <br />6. Approved Shop Drawings <br />7. Drawings <br />8. Referenced Standards. <br />B. Written/computed dimensions shall govern over scaled dimensions. <br />00800-2 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 2F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract Documents \00800 - <br />Supplementary Conditions 05-13 rev.doc <br />