My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -4.02 Subsurface and Physical Conditions <br />SC -4.02 Add the following new paragraphs immediately after paragraph GC -4.02.B: <br />C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER's <br />Consultants relied upon the following reports of explorations and tests of <br />subsurface conditions at the Site: <br />Soil Survey: None <br />SC -5.01 Performance, Payment and Other Bonds <br />SC -5.01.A. Delete paragraph GC -5.01.A in its entirety and insert the following paragraphs in its <br />place: <br />Within fifteen (15) days of receipt of the Contract Documents for execution, the <br />CONTRACTOR shall furnish a Public Construction Bond in an amount <br />equal to 100% of the Contract Price. <br />1 In lieu of the Public Construction Bond, the CONTRACTOR may furnish <br />an alternative form of security in the form of cash, money order, certified <br />check, cashier's check, irrevocable letter of credit or a security as listed in <br />Part II of F.S. Chapter 625. Any such alternative form of security shall be <br />for the same purpose, and be for the same amount and subject to the <br />same conditions as those applicable to the bond otherwise required. The <br />determination of the value of an alternative form of security shall be made <br />by the OWNER. <br />2. Such Bond shall continue in effect for one (1) year after acceptance of the <br />Work by the OWNER. <br />3. The OWNER shall record the Public Construction Bond with the Public <br />Record Section of the Indian River County Courthouse located at 2000 <br />16th Avenue, Vero Beach, Florida 32960. <br />SC -5.03 Certificates of Insurance <br />SC -5.03 Delete the second sentence of paragraph GC -5.03 in its entirety. <br />SC -5.04 CONTRACTOR's Liability Insurance <br />SC -5.04 Add the following new paragraphs immediately after paragraph GC -5.04.B: <br />C. The limits of liability for the insurance required by paragraph 5.04 of the General <br />Conditions shall provide coverage for not Tess than the following amounts or <br />greater where required by Laws and Regulations: <br />1. Worker's Compensation: To meet statutory limits in compliance with the <br />Worker's Compensation Law of Florida. This policy must include <br />Employer Liability with a limit $100,000 for each accident, $500,000 <br />disease (policy limit) and $100,000 disease (each employee). Such <br />policy shall include a waiver of subrogation as against OWNER and <br />ENGINEER on account of injury sustained by an employee(s) of the <br />CONTRACTOR. <br />2. Commercial General Liability: Coverage shall provide minimum limits of <br />liability of $1,000,000 per occurrence Combined Single Limit for Bodily <br />Injury and Property Damage. This shall include coverage for: <br />a. Premises/Operations <br />00800-3 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 3F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail Wdmin\bid documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.