SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C: <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or <br />entity, to the extent practicable, information about amounts paid to CONTRACTOR on <br />account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br />other individual or entity. <br />SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER has obtained the following permits (copies of these permits are <br />contained in Appendix "A"): No permits required <br />2. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences <br />in its place: <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.B) for the additional or unforeseen work. Labor includes foremen <br />actually engaged in the work; and will not include project supervisory personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel spent on <br />the contract. In no case shall an officer or director of the Company, nor those <br />persons who own more than 1% of the Company, be considered as project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />00800-7 <br />00800 - Supplementary Conditions 05-13 rev <br />00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract Documents\00800 - <br />Supplementary Conditions 05-13 rev.doc <br />