My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod <br />shall be tamped so as to produce a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br />finished sod elevation is 1'/z" below paved shoulder. <br />On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means <br />of wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br />Sodding shall not be performed when weather and soil conditions are, in the <br />Engineer's opinion, unsuitable for proper results. <br />Sod shall be placed around all structures, equipment pads, etc. <br />Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br />as determined by the Engineer, for optimum results. After being placed, the sod shall <br />be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br />Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br />grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br />J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br />satisfactory condition until final acceptance of the project. Such maintenance shall <br />include repairing of any damaged areas and replacing areas in which the establishment <br />of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following is added: <br />The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />Item of Payment <br />Payment shall be made under: <br />Bid Item No. 11 — Performance Turf (Sod) (Bahia) - Per Square Yard <br />+ + END OF SECTION + + <br />01025-29 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking TrailWdmin\bid documentsWlaster Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.