My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are fertilizing, watering and maintenance as required to assure a healthy stand of <br />grass. Two applications of fertilizer will be required with the initial application being <br />fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do not <br />exhibit the characteristics to meet specifications, shall be replaced within two weeks of <br />notice from Owner or Engineer. All replacement sod shall be furnished/installed at no <br />additional cost to the Owner and shall be guaranteed for three months. All replacement <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall <br />be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. Where <br />the soil is sufficiently loose and clean, the Owner, at his discretion, may authorize the <br />elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0 - 7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the second <br />application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br />per acre, or 10 pounds per 1,000 square feet, by a spreading device capable of <br />uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets from <br />bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with appropriate <br />tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered <br />so as to avoid a continuous seam along the line of flow. Along the edges of such <br />staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to <br />01025-28 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.