Laserfiche WebLink
4. Density Tests: Meet the requirements of 200-7 with the exception of 200-7.2.1. <br />Within the entire limits of the width and depth of the base, obtain a minimum <br />density in any LOT of 98% of the maximum density as determined by FM 1-T 180. <br />5. Testing Surface: Test the surface in accordance with the requirements of 200-7.3.1. <br />Asphalt millings shall be applied with a wetting agent in two lifts not to exceed 6" per lift <br />and compacted to provide a smooth travel surface. <br />Item of Payment <br />Bid Item No. 8 — Asphalt Millings (4" Thick) — Per Square Yard <br />SECTION - 515 - PIPE HANDRAIL/GUIDERAIL <br />The work specified in this section shall conform to Section 515 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction. (2015 Edition) <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 9 — Pipe Handrail/Guiderail (Steel) — Per Linear Foot <br />SECTION - 522 — CONCRETE SIDEWALK <br />The work specified in this item shall conform to Section 522 of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge <br />Construction (2015). <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 10 — Concrete Sidewalk (6" Thick) — Per Square Yard <br />SECTION - 570 — PERFORMANCE TURF <br />The work specified in this item shall conform to Section 570 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2015). <br />A. Description: Sod for the project shall be of the variety that is common to the area and <br />of a variety approved by the Engineer. This work shall also include mowing, to be <br />mowed at maximum 6" height with a mulching mower. <br />B. Work Included: Scope of Work: The work specified in this section consists of the <br />establishing of a stand of grass, within the project, right-of-way, easements, and other <br />areas indicated on the Drawings, by furnishing and placing grass sod. Also included <br />01025-27 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract <br />Documents\Technical Specifications.doc <br />