My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODIFICATIONS: <br />1. Existing 4" thick concrete sidewalk along 28th Court and 45th Street shall be removed 12' wide and <br />replace with 6" thick concrete sidewalk. Revised Plan Sheet C2 of 3 and Contract Documents and <br />Specifications Sheet 00310-3 (Itemized Bid Schedule, Revised April 21, 2015) are attached. <br />2. Contract Documents and Specifications Sheet 00630-1 (Certificate of Substantial Completion)has <br />been revised to reflect calendar days in last sentence of page. Revised Section 00630 is attached <br />(includes pages 00630-1 and 00630-2). <br />ATTACHMENTS: <br />Revised Itemized Bid Schedule 00310-3 dated April 21, 2015 <br />Revised Plan Sheet C 2 of 3 <br />Revised Certificate of Substantial Completion 00630-1 and 00630-2 <br />Page 3 of 4 <br />F APublic Works\ENGINEERING DIVISION PROJECTS V1413 -Martin Luther King Walking TraiIAdmir bid documents \ADDENDUM (\Addendum No. 1 4-21-2015.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.