Laserfiche WebLink
Replanting or repair necessary due to the Contractor's negligence, carelessness or <br />failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. Clippings <br />shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following is added: <br />■- The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br />applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br />water, tools, equipment, labor and all other incidentals necessary. <br />ION <br />111110 <br />SOP <br />IMF <br />Item of Payment <br />Payment shall be made under: <br />Bid Item No. 570-1-2 — Performance Turf (Match Existing) - Per Square Yard <br />SECTION - 00700 HIGHWAY SIGNING <br />Signing for traffic control shall conform to the requirements of the Standard <br />Specifications (2015), Manual on Uniform Traffic Control Devices, Supplemental <br />Specifications, Roadway and Traffic Design Standards, manufacturer's specifications. <br />A. Traffic Signs: All existing signs which are the property of the Owner shall be <br />transported to the Indian River County Road and Bridge Maintenance Yard by the <br />Contractor during construction if they are within the construction limits. Care shall be <br />exercised by the Contractor during removal, storage and relocation so as not to <br />damage the signs. If any damage occurs, as determined by the Owner's Engineer or <br />Resident Construction Inspector, the sign shall be replaced by the Contractor with no <br />compensation. <br />B.' All reflective pavement markers shall be 4" x 4". <br />Payment shall be made under: <br />Bid Item No. 700-20-11— Single Sign Post (Furnish and Install, Less than 12 Square <br />Feet) — Per Assembly <br />Bid Item No. 700-20-40 — Single Sign Post (Relocate) — Per Assembly <br />01025-31 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\0225 20th Ave and 16th St Intersection Improvement\Admim\bid <br />documents\Master Contract Documents\Technical Specifications.doc <br />