My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-109
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:44:25 PM
Creation date
7/24/2015 1:24:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2015
Control Number
2015-109
Agenda Item Number
15.A.1.
Entity Name
Barth Construction
Subject
Amended Work Order # 1 Phase IV
Fire Station #1
Area
1500 Old Dixie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Provide a review with the Owner and Design/Builder to discuss the functional and <br />organizational relationships, project scope, functional requirements, first estimate <br />of construction and project cost and to confine the objectives for the project are <br />being met. <br />6. Provide Construction Documents at 60% and 90% for review and approval by the <br />Owner and construction pricing by Barth Construction. Construction Documents <br />shall include drawings, specifications, and other documents and electronic data <br />setting forth in detail the requirements for construction of the work. These <br />documents will include normal structural, mechanical, and electrical engineering <br />services. All Civil engineering Services for Design and Permitting of the Fire <br />Sprinkler main line and backflow preventer systems will be by others. <br />7. Provide 100% Construction documents for construction permitting and book form <br />specifications. Construction documents will comply with the requirements of <br />Article 3.2.3 of the Part 2 Agreement between Indian River County and Barth <br />Construction acting as Design/Builder. <br />B. Purpose <br />Construction Administration Services which will be considered Part 2 of our services. <br />C. Compensation to the Architect <br />Compensation for the Part 1 Services defined in Article "A" shall be a fixed fee of <br />$84,645.00, including Reimbursable Expenses. <br />D. Invoicing <br />Invoicing shall be every two weeks. The Architect realizes his compensation is <br />contingent upon Barth Construction being in receipt of payment from Indian River <br />County in accordance with the Master Agreement and the Florida Prompt Payment Act, <br />F.S. 218.70, however, EDB Architects requests that the agreement between Barth <br />Construction and IRC be front loaded to allow compensation for the Design Team work <br />performed in Part 1. <br />PROGRAMMING/SCOPE DATA $2,500.00 <br />SCHEMATIC DESIGN PHASE $19,328.00 <br />DESIGN DEVELOPMENT PHASE $24,160.00 <br />WORKING DRAWINGS PHASE $38,657.00 <br />REIMBURSABLE EXPENSES Included <br />PART 1 TOTAL FEES 584,645.00 <br />Page2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.