Laserfiche WebLink
EXHIBIT C <br />CONSTRUCTION COST ESTIMATE <br />INDIAN RIVER MEDICAL CENTER - HEALTH & WELLNESS CENTER <br />OFF-SITE TURN LANES & FAIR SHARE SIGNALIZATION UPGRADES <br />DESCRIPTION <br />QUANTITY UNIT UNIT COST TOTAL <br />IRMC llth Drive Right Turn Lane on 37th Street <br />Mobilization 1 LS $2,500.00 $2,500.00 <br />Maintenance of traffic 1 LS $3,000.00 $3,000.00 <br />Staked silt fence 400 LF $2.00 $800.00 <br />Floating turbidity barrier 1 EA $300.00 $300.00 <br />Wellpointing / dewatering 1 LS $3,000.00 $3,000.00 <br />Strip ditch sides, clean out ditch bottom 1 LS $1,500.00 $1,500.00 <br />Excavation (decel lane) 1 LS $3,000.00 $3,000.00 <br />12" Stabilized subgrade 836 SY $5.00 $4,180.00 <br />8" Crushed concrete base 738 SY $11.60 $8,560.80 <br />2" SP -12.5 asphalt & prime 733 SY $14.00 $10,262.00 <br />Thermoplastic striping & signs 1 LS $1,800.00 $1,800.00 <br />Survey / layout / as-builts 1 LS $3,500.00 $3,500.00 <br />Tota#'i I'eeala! ess Center Contribution <br />` 16d3201i <br />$42,402.80 <br />. IMoTe , F 043193 <br />1,17,40:0,1R,„ .. <br />Mas1.b 1, k 1 Tnc <br />7 <br />