Laserfiche WebLink
As CONSULTANT was completing the first draft for distribution to OWNER staff, CONSULTANT was <br />notified that the parcel identified should not be the only parcel considered. OWNER requested that <br />CONSULTANT undertake substantial revisions to the draft to incorporate an additional two potential <br />locations. This effort required an additional 16 hours of labor to search ownership information, update <br />approximately 6 figures, update report text and review/revise the cost estimate range. The original <br />scope of services assumed that only a single potential site would be identified and evaluated. <br />Additionally, the initial Scope of Services included approximately 8 hours of labor for the review of Flood <br />Insurance Rate Maps (FIRM) to determine flood zone impacts, if any. Upon evaluation of the FIRM <br />records, it was discovered that the majority of the area under consideration within the SRID was in <br />dispute and no updated FIRM documents were available to make the final flood zone determination. <br />Researching the dispute to complete the evaluation required an additional 4 hours of labor. <br />During the data collection effort, it was determined that a model existed for the SRID (prepared by third <br />party). At the request of OWNER's staff, CONSULTANT obtained a copy of the SRID model to determine <br />if data contained within the model was beneficial for the evaluation. Additionally, staff notified <br />CONSULTANT that a second model for an area of approximately 10,000 acres west of SRID should also <br />be reviewed to determine if additional siting options were available. CONSULATANT obtained and <br />reviewed both models in detail. While the models were ultimately determined to be drainage basin <br />models (no water quality or available quantity data included), the model reviews required an additional <br />12 hours of labor that was not included in the initial project budget. <br />Last, CONSULTANT initially budgeted for one draft evaluation to be prepared, incorporation of <br />comments received, and finalization of the evaluation. To date, CONSULTANT has provided three draft <br />documents with a final report still pending. CONSULTANT requests an additional 14 hours of labor for <br />incorporation of stakeholder comments, update cost estimates (as needed) and finalization of the <br />analysis. <br />The original Scope of Services did not include specific provisions for reviewing or evaluating Aquifer <br />Storage and Recovery (ASR) as an alternative option. CONSULTANT, however, included information <br />pertaining to the use of ASR wells in lieu of (or in addition to) an open reservoir system. This evaluation <br />included development of proposed well size, well locations, associated costs and regulatory viability. <br />The inclusion of the ASR evaluation required approximately 24 hours of additional labor. CONSULTANT is <br />not seeking additional funding for this effort. CONSULTANT believes that an evaluation of this nature <br />would not be technically complete or comprehensive without inclusion of ASR as an option. <br />TASK 4.0 <br />No change. <br />REQUEST FOR FUNDING ASSISTANCE FROM SJRWMD <br />TASK 5.0 MEETINGS WITH INTERESTED PARTIES AND REGULATORY AGENCIES <br />CONSULTANT has completed all meetings and presentations to date within the original budget estimate. <br />CONSULTANT is requesting an additional 12 hours of labor to accommodate preparation for and <br />participation in a workshop with BOCC and stakeholders to address comments received on the draft <br />report (not anticipated in original Scope of Services). <br />TASK 6.0 PROJECT AND QUALITY MANAGEMENT <br />No change. <br />OTHER SERVICES NOT INCLUDED IN THIS INITIAL SCOPE OF SERVICES <br />No change. <br />A-2 <br />jj1657_Ltr with ExhiW.doc <br />