My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of utility owners or other contractors performing other <br />work as contemplated by Article 7, fires, floods, <br />epidemics, abnormal weather conditions, or acts of <br />God. <br />12.04 Delays Within CONTRACTOR's Control <br />A. The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to and within the <br />control of a Subcontractor or Supplier shall be <br />deemed to be delays within the control of CONTRAC- <br />TOR. <br />12.05 Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A. Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or Milestones) in an amount <br />equal to the time lost due to such delay shall be <br />CONTRACTOR's sole and exclusive remedy for such <br />delay. <br />12.06 Delay Damages <br />A. In no event shall OWNER or ENGINEER be <br />liable to CONTRACTOR, any Subcontractor, any <br />Supplier, or any other person or organization, or to any <br />surety for or employee or agent of any of them, for <br />damages arising out of or resulting from: <br />1. delays caused by or within the control <br />of CONTRACTOR; or <br />2. delays beyond the control of both <br />OWNER and CONTRACTOR including but not <br />limited to fires, floods, epidemics, abnormal <br />weather conditions, acts of God, or acts or <br />neglect by utility owners or other contractors <br />performing other work as contemplated by <br />Article 7. <br />B. Nothing in this paragraph 12.06 bars a <br />change in Contract Price pursuant to this Article 12 to <br />compensate CONTRACTOR due to delay, <br />interference, or disruption directly attributable to <br />actions or inactions of OWNER or anyone for whom <br />OWNER is responsible. <br />ARTICLE 13 - TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br />13.01 Notice of Defects <br />A. Prompt notice of all defective Work of which <br />OWNER or ENGINEER has actual knowledge will be <br />given to CONTRACTOR. All defective Work may be <br />rejected, corrected, or accepted as provided in this <br />Article 13. <br />13.02 Access to Work <br />A. OWNER, ENGINEER, ENGINEER's Con- <br />sultants, other representatives and personnel of <br />OWNER, independent testing laboratories, and <br />governmental agencies with jurisdictional interests will <br />have access to the Site and the Work at reasonable <br />times for their observation, inspecting, and testing. <br />CONTRACTOR shall provide them proper and safe <br />conditions for such access and advise them of <br />CONTRACTOR's Site safety procedures and <br />programs so that they may comply therewith as <br />applicable. <br />13.03 Tests and Inspections <br />A. CONTRACTOR shall give ENGINEER timely <br />notice of readiness of the Work for all required <br />inspections, tests, or approvals and shall cooperate <br />with inspection and testing personnel to facilitate <br />required inspections or tests. <br />B. OWNER shall employ and pay for the <br />services of an independent testing laboratory to <br />perform all inspections, tests, or approvals required by <br />the Contract Documents except: <br />1. for inspections, tests, or approvals <br />covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />that costs incurred in connection with <br />said paragraph 13.04.B; and <br />as otherwise specifically provided in <br />C. If Laws or Regulations of any public body <br />having jurisdiction require any Work (or part thereof) <br />specifically to be inspected, tested, or approved by an <br />employee or other representative of such public body, <br />CONTRACTOR shall assume full responsibility for <br />arranging and obtaining such inspections, tests, or <br />approvals, pay all costs in connection therewith, and <br />00700 - General Conditions REV 5-10-13 <br />00700 - 34 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St Beautification\Admin\bid documents\Master Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.