Laserfiche WebLink
SECTION 01024 <br />FORCE ACCOUNT <br />1.1 General <br />CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br />necessary to perform additional work not covered on the Contract Drawings. <br />The force Account is intended as a contingency for unforeseen work. <br />1.1 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. <br />The value of force account work will be determined in accordance with Article <br />12 of the General Conditions. <br />i + EMfl (1C SECTION ± ± <br />END vI SECTION i v <br />01024- 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1506 -Gifford Neighborhood 45th St Beautification \Admin\bid <br />documents\Master Contract Documents \01024 - Force Account.doc <br />