My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/14/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
04/14/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 9:46:49 AM
Creation date
7/29/2015 2:09:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/14/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />WORK ORDER NO. 1 (ENGINEERING) <br />FOR <br />PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br />WITH <br />CARTER ASSOCIATES, INC. <br />PROJECT: <br />41st Street and U.S. Highway No. 1- Intersection Improvements <br />Indian River County Project No. 1359 <br />This Work Order No. 1 is in accordance with the existing AGREEMENT dated November 15, <br />2011 as amended November 4, 2014 between Carter Associates, Inc. (ENGINEER) and Indian <br />River County (COUNTY). This Work Order No. 1 amends the Agreement as follows: <br />SECTION Iā PROJECT LIMITS <br />This Work Order No. 1 is for the ENGINEER to perform all professional services in connection <br />with the design of a portion of 41st Street and U.S. Highway No. 1, including the intersection of <br />41st Street and Old Dixie Highway and the intersection of 41st Street and U.S. Highway No. 1. <br />The design will extend approximately 1,100' north, south and west of the intersection of OId <br />Dixie Highway. <br />The 41St Street eastbound left turn lane at the approach to OId Dixie Highway will require the <br />paving within the Florida East Coast Railroad (FECRR) right-of-way to be widened. It is <br />understood the FECRR will perform the required work to the railroad facility and will perform <br />review and approval of all work within the FECRR right-of-way. <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between ENGINEER and COUNTY, the ENGINEER shall provide Professional <br />services to complete all tasks as outlined in this Work Order No. 1; specifically detailed in the <br />attached proposal Exhibit A. <br />SECTION 01ā TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a. Within 120 calendar days of Notice to Proceed. <br />b. Time of FINAL project completion shall be within 30 calendar days of receipt of the <br />County's review comments from the 100% "Paper Submittal". <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1359-41st St_US1 Left Turn lane\Admin\agenda items\IRC CARTER ENG WO No. 1, 4-15- <br />2015.doc <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.