Laserfiche WebLink
1. Payroll costs for employees in the <br />-- - -' a!' ' •- e--- <br />mance of the Work under schedules of job <br />the basis of their time spent on the Work. <br />contributions, unemployment, excise, and <br />and retirement benefits, bonuses, sick leave, <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />Subcontractors. If required by OWNER, CON- <br />TRACTOR shall obtain competitive bids from <br />subcontractors acceptable to OWNER and <br />CONTRACTOR and shall deliver such bids to <br />OWNER, who will then determine, with the <br />advice of ENGINEER, which bids, if any, will be <br />acceptable. If any subcontract provides that the <br />Subcontractor is to be paid on the basis of Cost <br />of the Work plus a fee, the Subcontractor's <br />Cost of the Work and fee shall be determined <br />in the same manner as CONTRACTOR's Cost <br />of the Work and fee as provided in this para- <br />graph 11.01. <br />4. Costs of special consultants <br />(including but not limited to engineers, <br />architects, testing laboratories, surveyors, <br />attorneys, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />following: <br />a. The proportion of necessary trans- <br />portation, travel, and subsistence expenses of <br />CONTRACTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />b. Cost, including transportation and <br />maintenance, of all materials, supplies, equip- <br />ment, machinery, appliances, office, and <br />temporary facilities at the Site, and hand tools <br />not owned by the workers, which are consumed <br />in the performance of the Work, and cost, Tess <br />market value, of such items used but not con- <br />sumed which remain the property of CON- <br />TRACTOR. <br />c. Rentals of all construction equip- <br />ment and machinery, and the parts thereof <br />whether rented from CONTRACTOR or others <br />in accordance with rental agreements approved <br />by OWNER with the advice of ENGINEER, and <br />the costs of transportation, loading, unloading, <br />assembly, dismantling, and removal thereof. <br />All such costs shall be in accordance with the <br />terms of said rental agreements. The rental of <br />any such equipment, machinery, or parts shall <br />cease when the use thereof is no longer <br />necessary for the Work. <br />d. Sales, consumer, use, and other <br />similar taxes related to the Work, and for which <br />CONTRACTOR is liable, imposed by Laws and <br />Regulations. <br />e . Deposits lost for causes other than <br />negligence of CONTRACTOR, any Sub- <br />contractor, or anyone directly or indirectly <br />employed by any of them or for whose acts any <br />of them may be liable, and royalty payments <br />and fees for permits and licenses. <br />f. Losses and damages (and related <br />expenses) caused by damage to the Work, not <br />compensated by insurance or otherwise, sus- <br />tained by CONTRACTOR in connection with <br />the performance of the Work (except losses <br />and damages within the deductible amounts of <br />property insurance established in accordance <br />with paragraph 5.06.D), provided such losses <br />and damages have resulted from causes other <br />than the negligence of CONTRACTOR, any <br />Subcontractor, or anyone directly or indirectly <br />00700 - General Conditions REV 5-10-13 <br />00700 - 32 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1317-85th St Milling_91 st Ave to 101st Ave\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />