My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employed by any of them or for whose acts any <br />of them may be liable. Such losses shall <br />include settlements made with the written <br />consent and approval of OWNER. No such <br />losses, damages, and expenses shall be <br />included in the Cost of the Work for the <br />purpose of determining CONTRACTOR's fee. <br />g. The cost of utilities, fuel, and sanitary <br />facilities at the Site. <br />h. Minor expenses such as telegrams, <br />long distance telephone calls, telephone service <br />at the Site, expressage, and similar petty cash <br />items in connection with the Work. <br />i. When the Cost of the Work is used to <br />determine the value of a Change Order or of a <br />Claim, the cost of premiums for additional <br />Bonds and insurance required because of the <br />changes in the Work or caused by the event <br />giving rise to the Claim. <br />j. When all the Work is performed on the <br />basis of cost-plus, the costs of premiums for all <br />Bonds and insurance CONTRACTOR is <br />required by the Contract Documents to <br />purchase and maintain. <br />B. Costs Excluded: The term Cost of the Work <br />shall not include any of the following items: <br />1. Payroll costs and other compensation <br />of CONTRACTOR's officers, executives, princi- <br />pals (of partnerships and sole proprietorships), <br />general managers, engineers, architects, <br />estimators, attorneys, auditors, accountants, <br />purchasing and contracting agents, expediters, <br />timekeepers, clerks, and other personnel <br />employed by CONTRACTOR, whether at the <br />Site or in CONTRACTOR's principal or branch <br />office for general administration of the Work <br />and not specifically included in the agreed upon <br />schedule of job classifications referred to in <br />paragraph 11.01.A.1 or specifically covered by <br />paragraph 11.01.A.4, all of which are to be <br />considered administrative costs covered by the <br />CONTRACTOR's fee. <br />2. Expenses of CONTRACTOR's princi- <br />pal and branch offices other than <br />CONTRACTOR's office at the Site. <br />3. Any part of CONTRACTOR's capital <br />expenses, including interest on <br />CONTRACTOR's capital employed for the <br />Work and charges against CONTRACTOR for <br />delinquent payments. <br />4. Costs due to the negligence of CON- <br />TRACTOR, any Subcontractor, or anyone <br />directly or indirectly employed by any of them or <br />for whose acts any of them may be liable, <br />including but not limited to, the correction of <br />defective Work, disposal of materials or <br />equipment wrongly supplied, and making good <br />any damage to property. <br />5. Other overhead or general expense <br />costs of any kind and the costs of any item not <br />specifically and expressly included in <br />paragraphs 11.01.A and 11.01.B. <br />C. CONTRACTOR's Fee: When all the Work is <br />performed on the basis of cost-plus, CONTRACTOR's <br />fee shall be determined as set forth in the Agreement. <br />When the value of any Work covered by a Change <br />Order or when a Claim for an adjustment in Contract <br />Price is determined on the basis of Cost of the Work, <br />CONTRACTOR's fee shall be determined as set forth <br />in paragraph 12.01.C. <br />D. Documentation: Whenever the Cost of the <br />Work for any purpose is to be determined pursuant to <br />paragraphs 11.01.A and 11.01.B, CONTRACTOR will <br />establish and maintain records thereof in accordance <br />with generally accepted accounting practices and <br />submit in a form acceptable to ENGINEER an <br />itemized cost breakdown together with supporting <br />data. <br />11.02 Cash Allowances <br />A. It is understood that CONTRACTOR has in- <br />cluded in the Contract Price all allowances so named <br />in the Contract Documents and shall cause the Work <br />so covered to be performed for such sums as may be <br />acceptable to OWNER and ENGINEER. <br />CONTRACTOR agrees that: <br />1. the allowances include the cost to <br />CONTRACTOR (less any applicable trade <br />discounts) of materials and equipment required <br />by the allowances to be delivered at the Site, <br />and all applicable taxes; and <br />2. CONTRACTOR's costs for unloading <br />and handling on the Site, labor, installation <br />costs, overhead, profit, and other expenses <br />contemplated for the allowances have been <br />included in the Contract Price and not in the <br />allowances, and no demand for additional <br />00700 - General Conditions REV 5-10-13 <br />00700 - 33 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1317-85th St Milling_91st Ave to 101st Ave\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.