My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/12/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
05/12/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 2:16:48 PM
Creation date
8/12/2015 11:48:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/12/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Round Island Riverside Park Improvements Cost Estimates <br /> The following table provides a breakdown of estimated cost for the proposed Round Island Riverside Park <br /> improvements by project elements: <br /> Round Island Riverside Park Improvements FIND Waterways Assistance Program Project <br /> Project Elements Estimated Cost FIND Cost County Cost <br /> Replacement of observation/fishing $90,000 $90,000 <br /> boardwalk(380 linear feet,2600 square feet) <br /> Boat ramp approach / boat trailer parking $96,000 $96,000(FBIF) <br /> area,rebuild base/repave(±4800 sq.yds.) <br /> Parking for kayakers and day users, rebuild $50,000 $50,000(SRF) <br /> base/repave(2500 sq.yds.) <br /> Driveway access,rebuild base/repave(±2100 $42,000 $42,000(SRF) <br /> sq.yds.) <br /> TOTAL $278,000 $90,000 $188,000 <br /> FBIF:Florida Boating Improvement Funds. SR: Secondary Roads Fund. <br /> Archie Smith Fish House"Phase IIA"Restoration Cost Estimates <br /> The following table provides a breakdown of estimated cost for the proposed Archie Smith Fish House <br /> Phase IIA Restoration by project elements: <br /> Archie Smith Fish House Phase IIA Dock Restorations FIND Waterways Assistance Program Project <br /> Project Elements Estimated Cost FIND Cost County Cost <br /> Reconstruct main dock, add floating dock $450,500 $225,250 $225,250 <br /> kayak landing, and construct 4 boat slips <br /> (2,421 sq. ft.) <br /> Historic site architectural oversight $32,700 $16,350 $16,350 <br /> TOTAL $483,200 $241,600 $241,600 <br /> ATTACHMENT 2 <br /> 172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.