Laserfiche WebLink
Stormwater Pollution Prevention Plans (SWPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X <br /> "SECTION IV-TIME FOR COMPLETION" is being modified to incorporate the following: <br /> 1. Project shall be completed as follows: <br /> a. The time for completion of the 90% design drawings, permit applications, and <br /> Engineer's Opinion of Probable Construction Cost for the project shall be <br /> three (3) months from the date of execution of this ADDENDUM. Once <br /> permits are received, 100% design drawings shall be completed two (2) weeks <br /> thereafter. <br /> 2. Deliverables -The ENGINEER shall provide the COUNTY: <br /> a. Three(3) 11"x 17"paper signed and sealed of the 90%plans. Also, a pdf <br /> format set of the plans on a cd. <br /> b. FINAL five(5) 24"x 36"paper signed and sealed"hardcopy", AutoCad <br /> drawing file and PDF formats on CD. <br /> c. Work Product shall be prepared and supplied in State Plane geometry(NAD83 <br /> 2007 adjustment if applicable); digital versions are to be prepared and <br /> submitted so that the COUNTY or other consultants can readily use it for the <br /> design and analysis of the area, as defined. It shall contain all information <br /> necessary for third-party surveyor to independently recreate and/or utilize the <br /> survey work. It is acknowledged all final products become property of Indian <br /> River COUNTY and will be available for use by the public at large. <br /> "SECTION V—COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER or agrees to accept for services <br /> rendered pursuant to this Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1. The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows: <br /> Page 3 of 6 <br /> G:\LNR Support\Proposals\WPB\2015\SR 60-43rd Avenue\SR60-43RD AVE AMENDMENT 7 3-24-15.doc <br /> 119 <br />