Laserfiche WebLink
The following is a summary of costs: <br /> Charge Associated with New Total <br /> This Amendment Compensation <br /> Roadway Design <br /> Geotechnical Services(Tierra) $5,447.50 $35,487.50 <br /> Engineering $49,152.50 $312,797.03 <br /> (ARCADIS) <br /> Signal Plans $2,668.41 $31,488.41 <br /> (SIMMONS& WHITE Inc.) <br /> Stormwater Pollution Prevention Plans $0.00 $9,022.92 <br /> (ARCADIS) <br /> Permitting $11,760.00 $33,090.00 <br /> (ARCADIS) <br /> Surveying <br /> Design Survey $1,089.20 $63,690.40 <br /> (ARCADIS) <br /> Right of Way Survey and Map $0.00 $20,386.40 <br /> (ARCADIS) <br /> Structural Design <br /> Structural Design for SR 60 over <br /> Main Relief Canal bridge $0.00 $76,060.00 <br /> (Bridge Design Associates,Inc.) <br /> Structural Design for 43rd Avenue over <br /> Main Relief Canal bridge $9,224.00 $67,604.00 <br /> (Bridge Design Associates,Inc.) <br /> Landscape &Lighting Plans <br /> Landscape Architectural Services $4,000.00 $31,486.00 <br /> (Roy-Fisher Associates, Inc.) <br /> Lighting Plans $10,750.00 $39,835.00 <br /> (Techno Engineering) <br /> Page 4 of 6 <br /> G:\LNR Support\Proposals\WPB\2015\SR 60-43rd Avenue\SR60-43RD AVE AMENDMENT 7 3-24-15.doc <br /> 120 <br />