My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.. XH i <br /> BIH <br /> \\ v,---/ <br /> . <br /> ,, propertyfor proper drainage then it will be replaced at the county's expense. If these <br /> changes do not correct the current flooding issues on the Kurpils property than the <br /> county will pay for at their expense the same underground concrete culvert drainage <br /> & grate system as was installed on the Winkel's property alongside the east side of <br /> the private road located on 67th Avenue. If any water continues to flow from the <br /> north into Lateral A's subdivision along the west side of 66th Avenue through the <br /> Dowling's property then as per St. John's letter dated April 17, 2015 addressed to <br /> Chris Kafer and Deward Howard the county will install at their expense an outfall <br /> pipe for a historical swale alongside the Dowlings northeastern property line. <br /> 7. At the time the swale along the north side of the Kurpil property is constructed the <br /> County or its contractor will install an outfall pipe from the Kurpil pond to the swale. <br /> This work shall be done at the County's expense. <br /> 8. The County or its contractor will move dirt from the southeast area of the pond and 42,4 <br /> restore the bank and cover the bare soil with sod. The county will also remove all <br /> the cattails from the Kurpils pond. The county will re-grade and re-sod these areas <br /> along the pond banks with any required fill dirt at the county's expense. <br /> 9. The Sellers will sign the attached Temporary Construction Easements to allow the <br /> County on the property to perform the above cited tasks. <br /> 10. By separate document, the County and the Sellers will enter into a Lease Agreement <br /> for the remainder of the County stormwater retention pond property generally <br /> depicted on Exhibit "C", taking into consideration the following c ditions: <br /> 1.5— Wm...s o rtQ I_ <br /> 1. The Lease shall be for a term not to exceed 20 years. <br /> 2. The Lease shall contain a termination clause whereby the County or the Sellers ry <br /> could terminate the lease with a 90-day notice to the other. The lease will only V �/ <br /> be terminated by the County if it is determined that the county's drainage pond <br /> located on the eastern back of the leased property requires the ponds expansion <br /> due to construction from a 4 to 6 lane highway. At such time the lease will be <br /> terminated within 90 days of construction. <br /> 3. The Lease cannot be assigned by any party without written permission of the <br /> other party. <br /> 3 <br /> 213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.