My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
05/19/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 1:17:06 PM
Creation date
8/12/2015 1:26:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•A'4 <br /> Indian River County <br /> Emergency Services District Board of Commissioners <br /> 4225 43'Avenue <br /> Vero Beach,Florida 32960 <br /> Telephone: (772) 226-3900 FAX: 772-567-9323 <br /> Project: <br /> Fire Station 1, 1500 Old Dixie <br /> Site Work, Preparation and Improvements <br /> Emergency Services District <br /> AMENDED WORK ORDER NO. 1 <br /> FOR <br /> DESIGN/BUILD AGREEMENT <br /> PHASE IV <br /> WITH <br /> Barth Construction, Inc. <br /> This Amended Work Order No. 1 adding additional services to Work Order No. 1 dated <br /> December 16, 2014, is in accordance with the existing DESIGN/BUILD AGREEMENT PHASE <br /> I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian River <br /> County (County). This Amended Work Order No. 1 amends the agreement as follows: <br /> SECTION I — PROJECT LIMITS <br /> This Amended Work Order No. 1 adds additional tasks and services not included in Work Order <br /> No. 1 for the Design/Builder to perform in connection with design, programming, construction <br /> documents, civil engineering and related design for a temporary modular building. <br /> SECTION II -SCOPE OF SERVICES <br /> As agreed upon between Design/Builder and County, that the Design/Builder shall provide all <br /> engineering, architectural and construction services to complete all tasks as outlined in this <br /> Amended Work Order No. 1 specifically detailed in the attached proposal. The additional <br /> services include; <br /> • Additional schematic, design development services, based on the increased scope and <br /> scale of the proposed renovation $16,488.00 <br /> • Working drawings including a permit set of drawings based on the increased scope of <br /> proposed renovation $38,657.00 <br /> • Additional civil design services including a new design for the front driveway and the <br /> design of site plan for temporary modular housing while renovation and repairs are <br /> taking place $3,950.00 <br /> The amended proposals from the civil engineers, architect and Design/Builder are attached to <br /> this work order and incorporated herein. <br /> 222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.