Laserfiche WebLink
CARTER ASSOCIATES,INC. <br /> MARCH 2015 <br /> RATE SCHEDULE <br /> Engineer I(Registered -Principal) $150.00/hr <br /> Engineer(Registered-Senior Consultant) $140.00/hr. <br /> Engineer I(Registered) $140.00/hr. <br /> Engineer II(Registered) $125.00/hr. <br /> Engineer III -EIT $100.00/hr. <br /> Engineer Technician(Senior) $105.00/hr. <br /> Engineer Technician $ 85.00/hr. <br /> Surveyor I(Registered-Principal) $150.00/hr. <br /> Surveyor(Registered-Senior Consultant) $140.00/hr. <br /> Surveyor II(Registered) $125.00/hr. <br /> Surveyor.III(Registered) $100.00/hr. <br /> Survey Crew(4 Men) $143.00/hr. <br /> Survey Crew(3 Men) $130.00/hr. <br /> • <br /> Survey Crew(2 Men) $120.00/hr. • <br /> GPS RTK Survey Crew(3 Men) $150.00/hr. <br /> GPS RTK Survey Crew(2 Men) $135.00/hr. <br /> CADD Technician I $ 80.00/hr. <br /> CADD Technician II $ 70.00/hr. <br /> Secretary/Word Processor $ 45.00/hr. <br /> Inspector $ 62.00/hr. <br /> Recording and Permit Fees Cost+ 10% <br /> Materials Cost <br /> Mileage $0.505/mile <br /> Sub-consultants Cost+ 10% <br /> Reimbursable Expenses: <br /> Postage,Long Distance Calls, <br /> Federal Express,etc. Cost <br /> Blueprints $0.25/S.F. <br /> Mylar $1.75/S.F. <br /> Photocopy(8.5"x 11") $0.15/ea. <br /> • <br /> Photocopy(8.5"x 14") $0.25/ea. <br /> Photocopy(11"a 17") $0.35/ea. <br /> These fees shall be renegotiated on an annual basis 4.1N:UHBIPROPOSA0Barth-FireSlalion1-Addendum.doc Page 3 of 3 <br /> • 4 ,1 <br /> Sim:191 <br /> 02014 by CAI <br /> 233 <br />