My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
06/02/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 2:16:38 PM
Creation date
8/12/2015 2:05:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/02/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The Annual Average Daily Flow and the Maximum Daily Flows for calendar years <br /> 2012, 2013, 2014 and 2015 (thru Latest data available prior to submitting). Required <br /> for Form 2A. <br /> 4. A summary of the annual effluent toxicity test results <br /> 5. A Copy of the most recent Annual Wetlands System Treatment Compliance and <br /> Performance Report. <br /> 6. The most recent Annual Reclaimed Water or Effluent Analysis Report. <br /> 7. A map of the monitoring well locations with GPS coordinates. <br /> 8. Copies of any orders or notices issued by FDEP. <br /> 9. Copies of the Annual Flow meter Certifications for every flow meter <br /> 10. Digital copies of binding agreements with major reclaimed water users <br /> Details of the required information are attached in Attachment A <br /> Task 3 O&M Performance Report <br /> The O&M Performance report requires an inspection of the facility in the company of the <br /> chief operator and an evaluation of the performance of the treatment plant. The <br /> inspection will be combined with the project kick off meeting. <br /> Data required include the following: <br /> 1. A Digital Summary of 24 months of flow and all influent and effluent data <br /> covering the period from July 1, 2011 through July 30, 2012. (A digital summary of the <br /> data) <br /> 2. A Digital Summary of the Quarterly Groundwater Monitoring Data (3rd and 4m <br /> Quarter 2014, 1st and 2nd Quarter 2015) for all of the groundwater monitoring wells. <br /> 3. The Operating Protocol for the Facility <br /> ATKINS will develop the required report and submit a draft for review prior to final <br /> submittal. The owner and the chief operator will be required to sign the final document <br /> prior to submission to FDEP. <br /> Task 4 Response to Request for Additional Information <br /> Although every effort will be made to submit a complete permitting package, this is an <br /> NPDES permit and request for additional information from FDEP in response to EPA <br /> overview can be expected. Should additional time and effort in excess of this fee be <br /> required, Atkins will advise IRC prior to proceeding. <br /> Submittals <br /> Atkins will provide digital copies of each form or report for review and comment prior to <br /> assembly of the final permitting package. The final permitting package will be <br /> assembled in a single bound document for signature and submittal to FDEP. The <br /> submittal package will include the following: <br /> 1. Three copies for signature and submittal along with the permit fee of $5,000 <br /> provided by IRC. The check for the permit fee should be made out to the Florida <br /> Department of Environmental Regulation for renewal of IRC West WRF Plant Operating <br /> Permit# FL0041637. <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.