My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/09/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
06/09/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 2:33:07 PM
Creation date
8/13/2015 9:39:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/09/2015
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br /> No. 2 <br /> DATE OF ISSUANCE: June 9, 2015 EFFECTIVE DATE: June 9, 2015 <br /> OWNER: Indian River County <br /> CONTRACTOR: Summerlin's Marine Construction, LLC <br /> Bid No.: N/A <br /> Project: RENOVATIONS TO JONES' PIER DOCKS <br /> OWNER's Proj. # RFP 2014030 <br /> This Change Order authorizes the following changes in the Contract Documents for the <br /> Renovations to Jones' Pier Docks Construction Agreement: <br /> Description: <br /> Change Order No. 2 is for work relating to replacement /reconstruction the northern single- <br /> family dock on the Jones' Pier property, in addition to the original contract sum as amended <br /> by Change Order No. 1. Change Order No. 2 work is summarized as follows: <br /> • Curb installation on each side of dock for safety: $1,350.00 <br /> • Reconstruction of 8' x 20' terminal platform: $3,200.00 <br /> • Related engineering: $300.00 <br /> Total: $4,850.00 <br /> Reason for Change Order: <br /> To account for additional / overall costs for the small northern dock replacement, in addition <br /> to Change Order No. 1 cost, which was for 5' x 77' dock portion installation (only). <br /> Attachment: (List documents supporting change) <br /> Summerlin's Marine Construction, LLC Estimate for Replacement of Northern Dock <br /> CHANGE IN CONTRACT PRICE: <br /> Description Amount <br /> Original Contract Price $61,099.00 <br /> Change Order 1 (approved by BCC 11/14/14): $10,880.00 <br /> Increase this Change Order: $4,850.00 <br /> Contract Price with this Change Order: $76,829.00 <br /> ACCEPTED: APPROVED: <br /> By: By: <br /> CONTRACTOR (Signature) OWNER REPRESENTATIVE (Signature) <br /> Date: Date: Approved by the BCC 6/9/15 <br /> ATTACHMENT 1 <br /> Summerlin Contract Change Order 2 <br /> 00942-1 38 <br /> M:\LAAC\JONES'S PIER\FIND Grant APP 2013\Summerlin Contract Change Order 2.doc Rev.05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.