My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128B
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 10:39:16 AM
Creation date
8/25/2015 1:41:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/07/2015
Control Number
2015-128B
Agenda Item Number
8.D.
Entity Name
General Underground LLC
Subject
Water Main Extension
Area
Indian River Drive South of Roseland Road
Bid Number
2015029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor is responsible for obtaining a County Public Works Engineering Division right-of- <br />way permit. The Contractor shall also submit a Traffic Control Plan to the County Public Works <br />Traffic Engineering Division a minimum of 72 hours prior to construction and notify County Traffic <br />Engineering a minimum of 24 hours before any lane closures. A temporary access plan shall be <br />provided indicating how local traffic will be maintained while the existing road is removed and <br />reconstructed. Stand mounted Advance Construction signing shall be installed in accordance with <br />FDOT Index 602. One lane closures shall be in accordance with FDOT Index 603. When any <br />work encroaches the area between the centerline and two (2) feet outside the edge of pavement, <br />traffic shall be restricted to a single lane. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be generally described <br />as follows: <br />Project Name: 8" Water Main Extension on Indian River Drive South of Roseland <br />Road <br />Bid Number: 2015029 <br />Project Address: Indian River Dr. south of Roseland Rd. <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 10 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 16 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(c) From 91 calendar days to 120 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />Section 00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.