The Contractor is responsible for obtaining a County Public Works Engineering Division right-of- <br />way permit. The Contractor shall also submit a Traffic Control Plan to the County Public Works <br />Traffic Engineering Division a minimum of 72 hours prior to construction and notify County Traffic <br />Engineering a minimum of 24 hours before any lane closures. A temporary access plan shall be <br />provided indicating how local traffic will be maintained while the existing road is removed and <br />reconstructed. Stand mounted Advance Construction signing shall be installed in accordance with <br />FDOT Index 602. One lane closures shall be in accordance with FDOT Index 603. When any <br />work encroaches the area between the centerline and two (2) feet outside the edge of pavement, <br />traffic shall be restricted to a single lane. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be generally described <br />as follows: <br />Project Name: 8" Water Main Extension on Indian River Drive South of Roseland <br />Road <br />Bid Number: 2015029 <br />Project Address: Indian River Dr. south of Roseland Rd. <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 10 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all materials and equipment to be <br />utilized in the job. <br />3. Perform all photographic recording and documentation of conditions prior <br />to construction. <br />4. Locate all existing utilities in the area of work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 16 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(c) From 91 calendar days to 120 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />Section 00530-2 <br />