My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> INDIAN RIVER COUNTY <br /> ALTERNATIVE WATER SUPPLY EVALUATION <br /> SURFACE WATER RESERVOIR FEASIBILITY ANALYSIS(PHASE I) <br /> AMENDMENT NO.1 <br /> PROJECT BACKGROUND <br /> In April 2014,the Indian River County(OWNER) Board of County Commissioners authorized CDM Smith <br /> Inc. (CONSULTANT)to perform an evaluation of the feasibility of implementing a surface water reservoir <br /> to supplement potable water production to meet long-term needs.CONSULTANT delivered a draft of <br /> the analysis within 90 days of the authorization,and subsequently performed two significant revisions to <br /> that draft.The level of effort to produce the three drafts exceeded the estimate included in the original <br /> project budget.The following summarizes the additional efforts by task. <br /> The following Scope of Services addresses amended Phase 1 efforts. <br /> SCOPEOFSERVICES—PHASE 1 ONLY <br /> Consultant will perform the following task services associated with Phase 1 for the development of a <br /> surface water reservoir system: <br /> TASK 1.0 REVIEW OF PREVIOUSLY PREPARED ALTERNATIVE WATER SUPPLY MASTER PLAN <br /> No change. <br /> TASK 2.0 IDENTIFICATION OF AND COORDINATION WITH KEY STAKEHOLDERS <br /> Task 2.0 initially included 4 hours of coordination with stakeholders,with the balance of the <br /> coordination to be conducted by OWNER staff.CDM Smith provided approximately 16 hours of <br /> coordination throughout the draft evaluation process.Amendment No. 1 includes provisions for the <br /> additional 12 hours of coordination.This effort included additional meetings with the drainage district <br /> superintendents,fielding phone calls from various interested parties and coordination with drainage <br /> district consultants to obtain necessary information. <br /> TASK 3.0 FEASIBILITY ANALYSIS <br /> Task 3.0 included a caveat that OWNER staff would provide population projections for use in <br /> determining the demand for the 20-year planning horizon.CONSULTANT was directed to the <br /> Metropolitan Planning Organization(MPO)and developed the demand projections through calculations <br /> based on the MPO's traffic planning units count.This effort required an additional 8 hours of labor. <br /> The original Task 3.0 budget also assumed that the agricultural community would provide the long-term <br /> demand projections to be used in sizing the potable plus agricultural demand reservoir option. No <br /> agricultural demand projections were readily available to be provided for use.CONSULTANT developed <br /> the agricultural demand based on the SJRWMD District Water Supply Plan projections.This effort <br /> required an additional 4 hours of labor. <br /> A-1 ll1657_Ltrwith Exhibits.doc 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.