My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
network for the future land use scenario. <br /> Subtask 3.5-Statistical Analysis <br /> Using the results of the long-term continuous simulation,the CONSULTANT will perform a limited <br /> statistical analysis on the potential availability of surface water for existing and future.The statistical <br /> analysis will provide information on the potential reliability of available water over a range of values <br /> (e.g.,yield with 75 to 100 percent confidence intervals) based on the 20-year simulation of flow within <br /> the system for both the existing and future land use scenario. <br /> TASK 4-SUMMARY REPORT <br /> Subtask 4.1—Draft Summary Report <br /> The CONSULTANT will prepare a Summary Report documenting the results of Tasks 1,2,and 3.This will <br /> also include recommendations on the feasibility of pursuing the next phase based on the volume of <br /> available surface water within the system.The Summary Report will be submitted to the OWNER for <br /> review and comment. <br /> Subtask 4.3—Final Summary Report <br /> The CONSULTANT will prepare a final Summary Report documenting the results of Tasks 1,2,and 3 and <br /> addressed comments provided by both the OWNER and stakeholders(Task 5). Upon receipt of <br /> comments,CONSULTANT will finalize the report and deliver a digital(pdf)copy of the final report. <br /> TASK 5—STAKEHOLDER COORDINATION <br /> It is anticipated that there will be coordination with stakeholders regarding the review of the Summary <br /> Report. The CONSULTANT has budgeted for up to 3 stakeholder meetings (specifically with St.Johns <br /> River Water Management District,the Soil and Water Conservation District,and the Agricultural <br /> Advisory Committee)to discuss findings and answer questions.The CONSULTANT will also document the <br /> anticipated response to comments submitted by the additional stakeholders identified in Appendix B of <br /> the Phase 1 Summary Report. <br /> TASK 6-PROJECT QUALITY MANAGEMENT/MEETINGS <br /> Activities performed under this task consist of those general functions required to maintain the project <br /> on schedule,within budget,and that the quality of the work products defined within this scope is <br /> consistent with CONSULTANT's standards and OWNER's expectations.Specific activities included are <br /> identified below: <br /> Subtask 6.1-Project Kickoff and Progress Meetings <br /> CONSULTANT will prepare for and conduct a kick-off meeting for the project.The CONSULTANT will <br /> attend 12 monthly progress meetings during the estimated 12-month project duration.The <br /> CONSULTANT will prepare and distribute a bullet point summary of each meeting as appropriate.The <br /> CONSULTANT will also provide bi-weekly reports to the OWNER project manager that briefly summarize <br /> work progress and issues encountered to date on the project.This task also includes internal team <br /> meetings. <br /> ier ith A-4 0646_ExN6k A.docx <br /> 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.