My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Subtask 6.2-Quality Technical Review <br /> CONSULTANT maintains a quality management system program on all of its projects.An internal project <br /> planning and scope review session will be conducted at the start of the project.This action is required <br /> by CONSULTANT's quality management system guidelines.Technical Review meetings are budgeted for <br /> and will be performed to review various milestone submittals. <br /> DELIVERABLES <br /> • Draft Summary Report Section summarizing data collected under Task 1 including a summary of <br /> data gaps and recommendations. <br /> • Draft Summary Report Section summarizing site conditions and limitations,if any,on decreasing <br /> flows to the Sebastian River under Task 2.0. <br /> • Technical Memorandum summarizing modeling approach under Subtask 3.1. <br /> • Summary Report(draft and final)summarizing data collection efforts, modeling approach and <br /> results,as well as recommendations for next steps. <br /> ASSUMPTIONS <br /> • The H/H modeling performed under this scope of work will determine if there is sufficient <br /> surface water available(potential yield)for the SRID needs,Sebastian River MFLs and potable <br /> water supply purposes. <br /> • The firm yield for water supply purposes would be determined in a future phase of work <br /> examining surface water availability over time,the volume of the reservoir,climatological <br /> factors,water demand and reservoir operations. <br /> DATA TO BE PROVIDED BY OWNER/OTHERS <br /> • Available stage and velocity data. <br /> • Available survey data for canals and control structures. <br /> • Other data from SRID as requested in Subtask 1.1. <br /> PAYMENT AND COMPENSATION <br /> TBD(to become Exhibit B in Final Version) <br /> PROJECT SCHEDULE(to become Exhibit C in Final Version) <br /> The following project schedule has been developed based on approval of this Task Order is received on <br /> or before <br /> Task and Description Estimated Time of Completion <br /> (calendar days) <br /> Task 1—Data Collection,Compilation and Evaluation 180 days from NTP <br /> Task 2—Field Reconnaissance/Resource Assessment 60 days from NTP <br /> 120 days from receipt of data in <br /> Task 3—Hydrologic/Hydraulic(H/H)Evaluations Subtask 1.1 <br /> Task 4—Summary Report 300 days from NTP <br /> Task 5—Stakeholder Coordination 330 days from NTP <br /> Task 6- Project Quality Management/Meetings 365 days from NTP <br /> VAlai A-5 B1646_Exhlbl A.docx <br /> 123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.