My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/24/2015 <br /> Stakeholder Comments Received (cont.) <br /> SJRWMD (cont.) <br /> "SRID reservoir is a great idea/location for this purpose." <br /> "The larger reservoir looks great. Should be some cost-share funding <br /> given the IRL benefit in reduced nutrient loading." <br /> SJRWMD would not deter County from pursuing Upper Basin storage <br /> areas as a source (this was the position of previous staff in 2007) <br /> Consider interconnecting the 3 canals (D, C and L) to require just one <br /> intake pump location. <br /> Smith <br /> Potential Options Moving Forward <br /> Reservoir and new surface water WTP <br /> ASR and new surface water WTP <br /> Reservoir and ASR hybrid with new surface water WTP <br /> CUP modification to provide operational flexibility of North and <br /> South county wellfields to maximize existing infrastructure <br /> Meet future demand through increases to UFA demand if available <br /> Smith <br /> 1A6 •1\-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.