Laserfiche WebLink
Rich Szpyrka stated that there will be an Addendum to the Quantity sheets/ Itemized Bid <br />Schedule to change Pay Item 515-1-1 to 515-1-2 which changes the handrail item from steel to <br />aluminum. Also two line items will be added to the Itemized Bid Schedule with the Addendum these line <br />items are as follows: 334-1-13, SP -12-5 Asphalt -Roadway Apron, and 285-704 Optional Base Group 4 — <br />6" of Limerock Base. These items are being added to assist in transitioning to existing conditions, some <br />of the aprons at the roadway crossings will need to be replaced, this will be determined on a case by <br />case basis. The addendum will spell out the specifics. <br />DISCUSSION <br />Questions & answers <br />Paul Brown asked if the county does density and concrete testing. <br />Yes, the county will hire a firm to do geotechnical testing. This is controlled by IR County <br />inspector. <br />Question of start date was asked. <br />Projected. 1- week of August. <br />Rich suggested that everyone visit the project site. <br />Questions will be addressed in Addendum No. 1 <br />Certified payroll with wage rates will be required to be submitted by the contractor. Bulletin Board, EEO <br />for all subs over $10,000, FH 1273 must be included in all contracts. DBE participation is encouraged. <br />ATTACHED: <br />Sign in Sheet <br />