ADDENDUM #1 <br />120-7.2.4 Compaction Where Plastic Material Has Been Removed: Where <br />unsuitable material is removed and the remaining surface is of the A-4, A-5, A-6, or A-7 Soil <br />Groups, as determined by the Engineer, compact the surface of the excavated area by rolling <br />with a sheepsfoot roller exerting a compression of at least 250 psi on the tamper feet, for the <br />full width of the roadbed (subgrade and shoulders). Perform rolling before beginning any <br />backfill, and continue until the roller feet do not penetrate the surface more than 1 inch Do <br />not perform such rolling where the remaining surface is below the normal water table and <br />covered with water. Vary the procedure and equipment required for this operation at the <br />discretion of the Engineer. <br />120-7.2.5 Compaction of Material To Be Used In Base, Pavement, or Stabilized <br />Areas: Do not compact embankment material which will be incorporated into a pavement, <br />base course, or stabilized subgrade, to be constructed as a part of the same Contract. <br />120-7.2.6 Compaction of Grassed Shoulder Areas: For the upper 6 inch layer of all <br />shoulders which are to be grassed, since no specific density is required, compact only to the <br />extent directed <br />120-7.2.7 Compaction of Grassed Embankment Areas: For the outer layer of all <br />embankments where plant growth will be established, do not compact. Leave this layer in a <br />loose condition to a minimum depth of 6 inches for the subsequent seeding or planting <br />operations. <br />120-7.3 Compaction of Subgrade: If the plans do not provide for stabilizing, compact <br />the subgrade in both cuts and fills to the density specified in 120-9.5 For undisturbed soils, do <br />not apply density requirements where constructing narrow widening strips or paved shoulders <br />5 feet or less in width. <br />Where trenches for widening strips are not of sufficient width to permit the use of standard <br />compaction equipment, perform compaction using vibratory rollers, trench rollers, or other <br />type compaction equipment approved by the Engineer. <br />Maintain the required density until the base or pavement is placed on the subgrade. <br />120-8 Backfilling Around Structures and Pipe. <br />120-8.1 Requirements for all Structures: <br />120-8-1.1 General: Backfill around structures and pipe in the Dry whenever normal <br />dewatering equipment and methods can accomplish the needed dewatering. <br />129-8.1.2 Equipment and Methods: Provide normal dewatering equipment including, <br />but not limited to, surface pumps, sump pumps, wellpoints and header pipe and <br />trenching/digging machinery. Provide normal dewatering methods including, but not limited to, <br />constructing shallow surface drainage trenches/ditches, using sand blankets, perforated pipe <br />drains, sumps and siphons. <br />120-8.1.3 Backfill Materials: Backfill to the original ground surface or subgrade <br />surface of openings made for structures, with a sufficient allowance for settlement. The <br />Engineer may require that the material used for this backfill be obtained from a source entirely <br />apart from the structure <br />Do not allow heavy construction equipment to cross over culvert or storm <br />sewer pipes until placing and compacting backfill material to the finished earthwork grade or <br />to an elevation at least 4 feet above the crown of the pipe <br />120-8.1.4 Use of A-7 Material: In the backfilling of trenches, A-7 material may <br />be used from a point 12 inches above the top of the pipe up to the elevation shown on the <br />FDOT Design Standards as the elevation for undercutting of A-7 material <br />01025-29 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St_101 st Ave to CR510 <br />(LAP)\Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />