My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-159
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:36:18 PM
Creation date
9/11/2015 10:55:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2015
Control Number
2015-159
Agenda Item Number
8.X.
Entity Name
Kerns Construction & Property Management Corp.
Subject
Sidewalk Improvements
Contract Documents & specifications
Area
87th Street and 91st Avenue
Project Number
1205
Bid Number
2015036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #1 <br />120-8.1.5 Time of Placing Backfill: Do not place backfill against any masonry <br />or concrete abutment, wingwall, or culvert until the Engineer has given permission to do so, <br />and in no case until the masonry or concrete has been in place seven days or until the <br />specified 28 -day compressive strength occurs <br />120-8.1.6 Placement and Compaction: Place the material in horizontal layers <br />not exceeding 6 inches compacted thickness, in depth above water level, behind abutments, <br />wingwalls and end bents or end rest piers, and around box culverts and all structures <br />including pipe culverts When the backfill material is deposited in water, compact per 120- <br />8.2.5 and 120-8.3.4. <br />The Contractor may elect to place material in thicker lifts of no <br />more than 12 inches compacted thickness outside the soil envelope if he can demonstrate <br />with a successful test section that density can be achieved. Notify the Engineer prior to <br />beginning construction of a test section. Construct a test section of 500 feet in length. Perform <br />five tests at random locations within the test section. All five tests must meet the density <br />required by 120-7.2 Identify the test section with the compaction effort and soil classification <br />in the Agency Logbook. In case of a change in compaction effort or soil classification, <br />construct a new test section. When a test fails the requirements of 120-7.2, construct a new <br />test section. The Contractor may elect to place material in 6 inches compacted thickness at <br />any time. <br />120-8.2 Additional Requirements for Structures Other than Pipe: <br />120-8.2.1 Density: Where the backfill material is deposited in water, obtain a 12 inch <br />layer of comparatively dry material, thoroughly compacted by tamping, before verifying the <br />layer and density requirements Meet the requirements of the density Acceptance Criteria <br />120-8.2.2 Box Culverts: For box culverts over which pavement is to be constructed, <br />compact around the structure to an elevation not less than 12 inches above the top of the <br />structure, using rapid -striking mechanical tampers <br />120-8.2.3 Other Limited Areas: Compact in other limited areas using mechanical <br />tampers or approved hand tampers, until the cover over the structure is at least 12 inches <br />thick. When hand tampers are used, deposit the materials in layers not more than 4 inches <br />thick using hand tampers suitable for this purpose with a face area of not more than 100 in2. <br />Take special precautions to prevent any wedging action against the masonry, and step or <br />terrace the slope bounding the excavation for abutments and wingwalls if required by the <br />Engineer. <br />120-8.2.4 Culverts and Piers: Backfill around culverts and piers on both sides <br />simultaneously to approximately the same elevation. <br />120-8.2.5 Compaction Under Wet Conditions: Where wet conditions do not permit <br />the use of mechanical tampers, compact using hand tampers. Use only A-3 material for the <br />hand tamped portions of the backfill. When the backfill has reached an elevation and <br />condition such as to make the use of the mechanical tampers practical, perform mechanical <br />tamping in such manner and to such extent as to transfer the compaction force into the <br />sections previously tamped by hand <br />120-8.3 Additional Requirements for Pipe 15 Inches Inside Diameter or Greater: <br />120-8.3.1 General: Trenches for pipe may have up to four zones that must be <br />backfilled <br />Lowest Zone. The lowest zone is backfilled for deep undercuts up to within 4 inches of the <br />bottom of the pipe <br />01025-30 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St_101st Ave to CR510 <br />iLAP)\Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.