My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-159
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:36:18 PM
Creation date
9/11/2015 10:55:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/18/2015
Control Number
2015-159
Agenda Item Number
8.X.
Entity Name
Kerns Construction & Property Management Corp.
Subject
Sidewalk Improvements
Contract Documents & specifications
Area
87th Street and 91st Avenue
Project Number
1205
Bid Number
2015036
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM #1 <br />120-9 Acceptance Program. <br />120-9.1 Density over 105%: When a computed dry density results in a value greater <br />than 105% of the applicable Proctor maximum dry density, perform a second density test <br />within 5 feet. If the second density results in a value greater than 105%, investigate the <br />compaction methods, examine the applicable Maximum Density and material description. If <br />necessary, test an additional sample for acceptance in accordance with AASHTO T 99, <br />Method C. <br />120-9.2 Maximum Density Determination: Determine the maximum density and <br />optimum moisture content by sampling and testing the material in accordance with the <br />specified test method listed in 120-9.3 <br />120-9.3 Density Testing Requirements: Ensure compliance with the requirements of <br />120-9.5 by Nuclear Density testing in accordance with FDOT Florida Method FM 1-T 238. <br />Determine the in-place moisture content for each density test Use Florida Method <br />FM 1-T 238, FM 5-507 (Determination of Moisture Content by Means of a Calcium Carbide <br />Gas Pressure Moisture Tester), or ASTM D 4643 (Laboratory Determination of Moisture <br />Content of Granular Soils By Use of a Microwave Oven) for moisture determination <br />120-9.4 Soil Classification: Perform soil classification tests in accordance with <br />AASHTO T-88. Classify soils in accordance with AASHTO M-145 in order to determine <br />compliance with embankment utilization requirements. <br />120-9.5 Acceptance Criteria: Obtain a minimum density in accordance with 120-7 2 <br />with the following exceptions: <br />1) embankment constructed by the hydraulic method as specified in 120-6.3, <br />2) material placed outside the standard minimum slope as specified in <br />120-6.2.4; <br />3) other areas specifically excluded herein. <br />120-9.6 Frequency: Conduct sampling and testing at a minimum frequency listed in <br />the table below <br />Test Name <br />Frequency <br />Maximum Density <br />One per soil type <br />Density <br />1 per 500' RDWY (Alt Lift) <br />Soil Classification <br />One per Maximum Density <br />120-10 Maintenance and Protection of Work. <br />While construction is in progress, maintain adequate drainage for the roadbed at all <br />times. Maintain a shoulder at least 3 feet wide adjacent to all pavement or base construction <br />in order to provide support for the edges. <br />Maintain and protect all earthwork construction throughout the life of the Contract, and <br />take all reasonable precautions to prevent loss of material from the roadway due to the action <br />of wind or water. Repair any slides, washouts, settlement, subsidence, or other mishap which <br />may occur prior to final acceptance of the work. Maintain all channels excavated as a part of <br />the Contract work against natural shoaling or other encroachments to the lines, grades, and <br />cross-sections shown in the plans, until final acceptance of the project <br />120-11 Construction. <br />120-11.1 Construction Tolerances: Shape the surface of the earthwork to conform to <br />the lines, grades, and cross-sections shown in the plans In final shaping of the surface of <br />earthwork, maintain a tolerance of 0.3 foot above or below the plan cross-section with the <br />following exceptions <br />01025-32 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS \1205 -Vero Lake Estates Swk-87th St 101st Ave to CR510 <br />(LAP)\Admim\ADDENDUMS\ADDENDUM 1\Technical Specifications Addendum #1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.