My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-184
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:45:55 PM
Creation date
9/24/2015 12:13:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/22/2015
Control Number
2015-184
Agenda Item Number
8.K.
Entity Name
Blue Goose Construction
Vista Royale
Subject
Replace galvanized pipe
water main replacement
Area
Vista Royale Pine Arbor Lane
Project Number
UCP#4120
Bid Number
2015001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 201.5402 <br />IRC — REPLACE GALVANIZED WATER MAIN AND GALVANIZED WATER SERVICES IN <br />VISTA ROYAL <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: October 2015 EFFECTIVE DATE: October 2015 <br />OWNER. Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS L.AI3OR CONTRACT, BID NO. 2015001. AWARDED <br />September 9. 2014 <br />PROJECT: Construct 1100' of 4" and 2" 1 IDPE Dir. Bores to replace galvanized water. pipe <br />COUNTY UTILITY PROJECT NO.: UCP #4120 CONTRACTOR'S PROJECT NO.: I.; A <br />COUNTY WIT', No. 47123536:24.402-15,514 <br />You are directed to proceed promptly with the following work; <br />Description: Replace the corroded 3" galvanized water main and corroded 2" water services on Pine Arbor Lane. <br />Attachments: (List documents supporting work) <br />Method of determining Contract Price: <br />El Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of County <br />Commissioners on September 9, 2014 to Blue Goose Construction, Ise <br />Q Lump Sum <br />Cost of the Work <br />The Cost of _Labor, Contingency and Con net Time Is sumrr_arizeti below: <br />Estimated Labor Cost (rounded) _ <br />$66,000.99 <br />Estimated Contract Time: <br />60 days •-1 <br />i <br />Estimated Labor Cost (rounded) <br />$66,009.99 .. <br />ACCEPTED: <br />11:ECOMMENDED. <br />Blue Goose Construction <br />Labor Contractor <br />Date: <br />Cordon E. Sparks, P.E. <br />Environmental Engineer <br />Date: -_ <br />y-/6' — /s <br />APPROVED; <br />COUNTY, CHAIRMAN <br />Wesley S. Davis <br />DM:September 72, ?015 <br />Attest: Jeffrey R. Smith, Clerk of . ��t top of rn e n t 2 <br />'Circuit Court and Comptroller ; �o.• :,, <br />rF9N• <br />•. <br />• <br />Deputy Clerk; <br />:' ��.. Off• <br />• Z' <br />CAUscralsbusli\AppDatAl_ocalNieresgfllWindowslTentpanry lnteroet Film\CoJugnt,UutlooW LTR4YV\A3 • WA 041,j}tziAlgrilNlo 2015- <br />002:.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.