My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-193
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 8:25:15 AM
Creation date
10/12/2015 11:59:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/06/2015
Control Number
2015-193
Agenda Item Number
8.N.
Entity Name
CDM Smith, Inc.
Subject
Plant Well No. 7`
Amendment #1 Work Order #12
Area
South County Water Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smok <br />1701 Highway A1A, Suite 301 <br />Vero Beach, Florida 32963 <br />tel: 772 231-4301 <br />September 28, 2015 <br />Mr. Vincent Burke, P.E. <br />Director of Utility Services <br />Indian River County <br />1801 27th Street, Building A <br />Vero Beach, Florida 32960 <br />Subject: Work Order No. 12 — Amendment No. 1 <br />South County Water Treatment Plant Well No. 7 <br />Final Design, Permitting and Bidding Services <br />Dear Mr. Burke: <br />On July 1, 2014, the Indian River County (County) Board of County Commissioners (BOCC) authorized the <br />subject Work Order for CDM Smith to complete the design of a new production well at the South County <br />Water Treatment Plant to provide for operational flexibility of the wellfield. Since originally beginning <br />this project (under separate cover) in 2009, the County has now shifted from the Central District to the <br />Southeast District of the Florida Department of Environmental Protection (FDEP). As such, FDEP is now <br />requesting that the well location be shifted to allow easier access for compliance inspections. This <br />request from FDEP came after CDM Smith completed the 100 percent bid documents for the project. <br />Therefore, additional services are required to complete the relocation, redesign the electrical feed to <br />the well and complete the permitting services associated with the changes. Transmitted herewith are 3 <br />copies of Amendment No. 1 to Work Order No. 12 to complete these additional activities. <br />Sincerely, <br />4g, Irma - <br />Jill T. Grimaldi, BCES <br />Principal Scientist <br />CDM Smith Inc. <br />File: 105001.02.01 <br />cc: Arjuna Weragoda, County <br />Eric Grotke, CDM Smith <br />O RL0191-Lt r-29sep2015 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.