EXHIBIT A <br />SCOPE OF WORK <br />INDIAN RIVER COUNTY <br />SOUTH COUNTY WATER TREATMENT PLANT <br />FINAL DESIGN, PERMITTING AND BIDDING SERVICES <br />FOR PROPOSED WELL NO. 7 <br />AMENDMENT NO. 1 <br />This Authorization, when executed, shall be incorporated in and become part of the Contract for <br />Consulting/Professional Services between the Indian River County (County), and CDM Smith Inc. <br />(Consultant), dated December 6, 2011 hereafter referred to as the Contract. <br />BACKGROUND <br />The County owns and operates the South County Water Treatment Plant (WTP) which currently <br />operates with six existing Upper Floridan Aquifer (UFA) production wells. The existing Consumptive Use <br />Permit (CUP) for the South County WTP also includes a future permitted seventh well that has not yet <br />been constructed. In August 2009, the Board of County Commissioners approved a Work Order for the <br />Consultant to design, permit and provide services during construction of the proposed well and raw <br />water pipeline. After reaching the 100 percent design level (minus the County's front-end documents), <br />staff decided to put the project on hold and not construct the well. The County now wishes to finalize <br />design, complete the bid package and finalize permitting of the proposed well at the South County WTP. <br />In July 2014, the County authorized Work Order No. 12 for the Consultant to complete the design and <br />permitting activities that begun in 2009, as well as to provide bidding services for the new well. Since <br />the 2009 efforts, the County has shifted from the Central District FDEP to the Southeast District of FDEP. <br />This change resulted in a change in permitting staff and the previously proposed well location became a <br />topic of concern for the Southeast District staff. FDEP requested that the well be relocated out of the dry <br />stormwater treatment area and onto higher ground to allow for ease of access during compliance <br />inspections during or after storm events. This change requires that the 100 percent design plans for both <br />the well/wellhead and the pipeline be updated to reflect the new location, as well as to provide a <br />modified electrical design. <br />The following is the scope of services to be provided under this authorization is amended as follows. <br />SCOPE OF SERVICES <br />Consultant will perform the following task services: <br />Task 1.0 <br />No changes. <br />TASK 2.0 <br />No changes. <br />COORDINATION WITH FWS <br />MEETING WITH SJRWIVID <br />TASK 3.0 PREPARATION OF FINAL BID PACKAGE <br />Subtask 3.1 Final Contract Documents <br />CDM Smith will update the Wellhead and Pipeline plans to reflect the revised location of the well. Final <br />plans will also include modifications to the electrical design to accommodate power being provided from <br />A-1 <br />Amendment No 1.doc <br />