My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-193
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 8:25:15 AM
Creation date
10/12/2015 11:59:00 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/06/2015
Control Number
2015-193
Agenda Item Number
8.N.
Entity Name
CDM Smith, Inc.
Subject
Plant Well No. 7`
Amendment #1 Work Order #12
Area
South County Water Treatment Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a different location than previously considered. This task will include one discussion with FP&L to <br />confirm the power feed assumptions. It is not anticipated that the specifications will require <br />modification as a result of the relocation, however, the bid summary will be updated to reflect revised <br />pipeline lengths. <br />Subtask 3.2 <br />No changes. <br />Final Contract Document Submittal <br />Subtask 3.3 Preparation of Probable Construction Cost <br />The final construction cost estimate will not be revised to reflect the change in location. The primary <br />cost change will be the overall reduction in transmission piping. <br />TASK 4.0 WELL CONSTRUCTION PERMITTING <br />Consultant to date has provided permitting services in excess of the originally budgeted effort due to <br />the change in FDEP District and unanticipated requests for information resulting from the Southeast <br />District preferences in well location. Amendment No. 1 will allow for recovery of additional costs to <br />date, as well as provide for Consultant to complete the permitting task. <br />This estimate is based on the assumption that County staff has contacted both FDEP and SJRWMD to <br />gain concurrence from each regulatory agency on the proposed new well location. County staff has <br />indicated that FDEP has conceptually agreed to the new location, pending resubmittal of the permit <br />application, and that SJRWMD has also agreed to the new location from both a consumptive use permit <br />and environmental resource permit (stormwater) perspective. No additional services are included <br />herein for these efforts. <br />TASK 5.0 <br />No changes. <br />BIDDING SERVICES <br />TASK 6.0 PROJECT AND QUALITY MANAGEMENT <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this scope is <br />consistent with Consultant's standards and the County's expectations. Specific activities included are <br />identified below: <br />Subtask 6.1 Project Quality Management <br />Amendment No. 1 increases the Project Management hours to account for extended project duration <br />due to the well location discussions. <br />Subtask 6.2 <br />No changes. <br />Project Status Reports <br />OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br />This authorization does not include: <br />■ Modifications to the groundwater model prepared by Post, Buckley, Schuh and Jernigan; <br />▪ Preparation and submittal of the SJRWMD well construction and well completion forms (to be <br />completed by Contractor); <br />• Certification of Construction Completion and Request for Clearance to Place Permitted PWS <br />Components into Operation (FDEP Permit form); <br />A-2 <br />Amendment No 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.