My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-042
CBCC
>
Resolutions
>
1990'S
>
1996
>
1996-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2015 3:53:36 PM
Creation date
10/15/2015 2:28:16 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1996-042
Approved Date
03/19/1996
Resolution Type
Sale of water and sewer revenue bonds
Subject
Bonb Purchase Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOD water treatment capacity plus the 3.0 MGD proposed North County RO Plant capacity will provide <br />adequate water capacity to the year 2002. <br />Sew► - The County owns and operates nine wastewater secondary treatment plants. The four largest <br />planta are designated as regional plants (North, Central, South, and West) and account for a nominal capacity <br />of 3.85 MGD in the aggregate. The County is currently completing a 1.0 MGD expansion of its West Regional <br />Treatment Plant. The expansion is scheduled for completion by April, 1996. Another 1.39 MGD capacity is <br />allocated to the County at the Vero Beach Wastewater Plant. The County's South Regional Treatment Plant <br />is in design and permitting for an additional 1.150 MOD expansion and is projected to receive bids for the <br />project in September, 1996. The County's Central Treatment Plant is in design and permitting for an additional <br />1.0 MOD of capacity. <br />The County has constructed a 180 acre wetland for effluent disposal treatment adjacent to the West <br />Regional Treatment Plant. The wetland is designed for 6.0 MGD effluent disposal treatment capacity with an <br />initial permitted disposal capacity of 2.0 MGD. <br />Effluent is total reuse by spray irrigation onto golf courses. <br />After the current planned expansions of the systems represented by the Series 1996 Projects to be funded <br />with the Series 1996 Bonds, the system capacity is projected by the County to be adequate to the year 2003. <br />The County is in compliance with all state and federal guidelines at its wastewater facilities. Infiltration <br />into the system would be rated as low. <br />The County has an ordinance for industrial pretreatment and mandatory hookup requirements. <br />Swmaasry - In summary, as previously outlined, the currently planned plant expansions will supply <br />projected plant capacity requirements for water until 2002 and sewer until 2003. <br />The plant expansions will generate an estimated $44.8 M in impact fee revenues, which will provide <br />capital funding for future expansion requirements. <br />[remainder of page intentionally left blank] <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.