Laserfiche WebLink
• <br />DESCRIPTION AND CONDITIONS <br />On May 8, 2001, the County and an engineering team led by Carter Associates, Inc. entered into a <br />contract (Professional Engineering Services Agreement and Work Order No. 1) for professional <br />engineering services for the East Indian River County Master Stounwater Management Plan (Master <br />Plan). The completion of the Master Plan as described in Work Order No. 1, contemplated that by <br />the time the analysis portion of the project was to be performed, St. Johns River Water Management <br />District (SJRWMD) would have purchased property for the consulting team to evaluate with respect <br />to stounwater treatment and storage alternatives. This has not occurred and therefore, the initial <br />emphasis of the study is shifting to focus on in -canal solutions and sites owned by the County that <br />are adjacent to Indian River Fauns Water Control District (IRFWCD) canal right-of-way. The <br />Amendment to Work Order No. 1, attached hereto, covers this new study emphasis. Additionally, <br />the project scope is being expanded to include the \orth Relief Canal drainage basin, over 10,000 <br />acres. The study involving the North Relief Canal will investigate the feasibility of placing <br />demineralization concentrate from Utility Services' North County Reverse Osmosis Plant into the <br />canal, in accordance with Florida Department of Environmental Protection (FDEP) requirements and <br />Indian River Farms Water Control District. Therefore, Utility Services is participating in the cost <br />of the study. <br />The time to perfoini certain phases of this project is critical because the Governor has expressed a <br />desire to release state funds to help stimulate the economy. Therefore, we are asking the Board of <br />Commissioners to approve this Amended Work Order before it is formally approved by SJRWMD <br />in order to allow the consulting team to fast track the design of specific projects. We cortinue to <br />communicate our intent with SJRWMD and have transmitted the scope of services for the <br />Amendment to Work Order No. 1 to SJRWMD for inclusion in a new Cost -Share Agreement <br />between it and the county for this project. <br />Also, a Memorandum of Understanding (MOU) has been prepared by SJRWMD and the County, <br />giving the County complete design and construction control over projects that result from the Master <br />Plan, and allowing SJRWMD to assume its traditional role as a permitting agency for the projects. <br />The MOU also allows the county to receive $4.33 million that the Florida legislature has allocated <br />for stormwater improvement projects within the IRFWCD drainage basin. <br />RECOMMENDATIONS <br />Staff recommends that the Board of County Commissioners authorize the Chairman to execute the <br />Amendment to Work Order No. 1 for the East Indian River County Master Stor niwater Management <br />Plan. <br />FUNDG <br />Total contract amount $307,870.00. <br />Funding to be from the following Accounts: <br />1. Account No. 111-243-519-033.19 <br />2. Account No. 111-243-519-033.49 <br />3. Account No. 109-214-541-03119 <br />4. Account No. 109-214-541-033.49 <br />5. Account No. 111-214-541-033.19 <br />6. Account No. 001-210-572-033.19 <br />7. Dept. of Utility Services Account No. 472-000-169-392 <br />ATTACHMENTS <br />1. Amendment to Work Order No. 1 to the Professional Engineering Services Agreement <br />Between Carter Associates, Inc., and Indian River County, Florida, Dated May 8, 2001 <br />for the East Indian River County Master Stointwater Management Plan. (Two copies) <br />January 15, 2002 <br />79 <br />• <br />