My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/8/2002
CBCC
>
Meetings
>
2000's
>
2002
>
1/8/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:42:05 PM
Creation date
9/25/2015 4:33:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
01/08/2002
Archived Roll/Disk#
2551
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />10. Traffic Circulation: Although the plan proposes a reduction in overall commercial building <br />area the proposal for restaurant/fast-food uses will result in an increase in traffic from the <br />former Vero Mall traffic levels. This level of traffic increase was addressed through the plan <br />review process. <br />There are four existing driveways that connect to the site. Two of these driveways are on U.S. <br />1 and two are on 12°' Street. These existing driveways will remain with some upgrading, and <br />will continue to service the site. The internal circulation plan will be modified to provide a <br />more efficient parking lot layout. The internal circulation plan has been reviewed and <br />approved by the county Traffic Engineering Division. <br />A traffic impact analysis (TIA) has been reviewed and approved. Based on the TIA, there is <br />one off-site improvement and one on-site improvement that need to be constructed. The off- <br />site improvement is re -activation of the traffic signal at the site's easternmost 12th Street <br />driveway (aligns with Commerce Avenue to the south). The on-site improvement required is <br />a dual egress lane at the main (easternmost) driveway on 12th Street. The final major site plan <br />application will need to provide a dual egress lane driveway design that is acceptable to the <br />County Traffic Engineering Division. <br />11. Stormwater Management: The PD plan proposes a 48,138 square foot reduction in <br />impervious surface arca on site which will reduce run-off Also, the plan proposes use of the <br />existing underground stormwater treatment system. The project's conceptual stonnwater <br />management plan has been approved by the public works department, and the developer will <br />be required to obtain a Type ' A" county stomzwater permit prior to release of the final site <br />plan. <br />12. Utilities: The project will continue to be connected to County water and sewer. These utility <br />provisions have been approved by the County Utilities Department and the Environmental <br />Health Department. <br />13. Landscape Plan and Buffers: The landscape plan is in compliance with Chapter 926. This <br />includes an upgraded landscape strip along U.S. 1 and 12th Street and foundation planting along <br />the east and south sides of the renovated Mall building. The out -parcel buildings will comply <br />fully with the S.R. 60 foundation planting cnteria_ <br />14. Environmental Issues: <br />• Uplands- Since the site is over 5 acres, the native upland habitat requirements of section <br />929.05 potentially apply. However, there is no native upland habitat on the site; <br />therefore, no set aside is required. <br />• Wetlands: The environmental planning staff has verified that there are no jurisdictional <br />wetlands on the subject site. Therefore, no wetland permits are required. <br />15. Dedications and Improvements: <br />• U.S. 1 sidewalk: A 5' wide public sidewalk is existing along the site's U.S.1 frontage, and <br />will need to be maintained. <br />• 12th Street Sidewalk: A 5' sidewalk is existing along the site's 12th Street frontage and will <br />need to be maintained. <br />January 8, 2002 <br />59 <br />8r I <br />(1 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.