Laserfiche WebLink
TOTAL AMOUNT OF LOW BID $48,673. 62 <br /> i <br /> SOURCE OF FUNDS Water Utilities Other Improvements (Except { <br /> Bldg. Funds <br /> ESTIMATED BUDGET: 5 3009000.00 <br /> ANALYSIS <br /> The Staff reviewed the five bid packages, and checked the individual items. as well as the subtotals and <br /> totals for each one submitted. The low bid was then tested by applying the unit prices from each bidder. to <br /> a small. low-pressure force main project proposed in the City of Sebastian. This is the type of project the <br /> labor contract will typically be used for. ( See attached table) . The costs for labor for the project are given <br /> below for each bidder. <br /> HYPOTHETICAL PROJECT TOTAL COST <br /> G. E. French_ utilitv constructors. Ft. Pierce. FLA S 24 .085 . 95 <br /> Treasure Coast Contracting, Vero Beach_ FLA $ 34.406 .25 <br /> Sheltra & Sons. Inc. . lndiantowrt FLA S 54. 162 . 81 <br /> Empower Construction. Inc. . Frostproof FLA $ 59.238. 3 <br /> H2O Utilitv Services_ Holiday. FLA S 30. 906 .25 <br /> This "test" helps verify that G. E . French is the low bidder for relatively small assessment and other type <br /> water and sewer projects that the Utilities Department intends to engage the company for. Staff made a visit <br /> to Mr. French ' s office. as well as to a site development project currently under construction in FL Pierce by <br /> Mr. French. This. along with a positive response from references provided by Mr. French. has resulted in <br /> the following recommendation. <br /> RECOMMENDATION <br /> Staff recommends that the bid be awarded to G. E. FRENCH , as the lowest most responsive and <br /> responsible bidder meeting the specificauons for Bid No. 3032 : the Labor Contract Agreement. and that the <br /> Chairman execute the same . <br /> ON MOTION by Vice Chairman Stanbridge , SECONDED BY <br /> Commissioner Adams , the Board unanimously awarded Bid <br /> # 3032 to G . E . French in the amount of $ 48 , 673 . 62 for work as <br /> set out in the bid documents , as recommended in the <br /> memorandum . <br /> LABOR CONTRACT AGREEMENT IS ON FILE <br /> IN THE OFFICE OF THE CLERK "1-0 TI IE BOARD <br /> January 9 , 2001 <br /> k1 , <br /> i 8 C 46 <br />