Laserfiche WebLink
• <br />ALTERNATIVES AND A.LNALYSIS <br />Utemative 1: Approve this Amendment No. 2 and construct the pavilion as proposed. <br />alternative 2: Add a master stormwater pond and the associated site -work to direct all runoff from the Fairgrounds <br />to the master pond. This would eliminate the stormwater management tracts immediately East of the new pavilion, <br />and the existing Arena building, and would provide capacity for the future construction of several more buildings. <br />This alternative would add $97,024.00 to the cost of the project. This is a value-added element that would be Less <br />expensive to do now rather than constructing individual stormwater tracts with each new future building <br />Alternative 3: Add insulation to the roof and wall panels. This is a value-added item that will extend the life of the <br />panels. The insulation will reduce condensation on the inside of the building and therefore protect the metal from <br />getting wet and rusting. The insulation cannot be added in the future without disassembling the roof and wall <br />panels, which is expensive and is highly discouraged. This alternative will cost $17,426.00 <br />Alternative 4: Staff intends to add electric services (lighting and power) to the project with a future Amendment. <br />The cost of the electric installation is $26,253.00. Providing lights and power will make the building more <br />marketable to event operators, and is therefore critically important to generating revenue with the new facility. The <br />added bookings and increased rental rates generated by having the electric services, compared to not having electric <br />services, will `pay -back' the cost of the installation of the electric services within a few years of use Staff intends to <br />fund this item with the Fair Improvement Fund We anticipate that with the addition of this year's contribution from <br />the Fair Association, there will be sufficient funds available to completely cover this expense. <br />RECOhMhMENDATIONS AND FUNDING <br />Staff recommends that the Board select Alternative No.1, to approve Amendment No. 2 for fmal design and <br />permitting and construction phase services for $447,304.00 and authorize the Chairman to execute the Amendment <br />Staff further recommends that the Board direct staff to bring <br />back a future No.3, and No.4 to the CONTRACT. Funds will be dedicated from the 1-0 localnt tax c onttinge cyfund to <br />pay for Alternatives Not. and No.3, and from the Fair Improvement Fund for Alternative No.4. <br />This project is partially funded by a grant from the r'crida Depa, u .;.it ofA,giculture and Consumer Services, and <br />partially from the 1-0 local option sales tax funu. The account number is 31521072-066510-02005. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Tippin, the Board unanimously approved Alternate <br />#1 approving Amendment No. 2 for $447,304 and authorized the <br />Chairman to execute the Amendment. (The balance of staff's <br />recommendation was not approved at this time.) <br />NOVEMBER 12, 2002 <br />AMENDMENT IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />131 <br />par/ <br />• <br />I:km <br />