Laserfiche WebLink
Development on the subject property would be served by the North County Reverse Osmosis Plant, <br />which currently has a remaining capacity of more than 11500,000 gallons/day and can accommodate <br />the additional demand generated by the proposed land use amendment. <br />Wastewater <br />Based upon the most intense use allowed under the proposed land use amendment, development of <br />the property will have a wastewater generation rate of approximately 426 Equivalent Residential <br />Units (ERU), or 106,500 gallons/day. This is based upon a level of service of 250 gallons/ERU/day_ <br />County wastewater service is available to the site from the North Regional Wastewater Treatment <br />Plant, which currently has a remaining capacity of over 184,600 gallons/day and can accommodate <br />the additional wastewater generated by the subject request. <br />Solid Waste <br />Solid waste service includes pick-up by private operators and disposal at the county landfill. The <br />county's adopted level of service standard for landfill capacity is 1.97 cubic yards/person/year. With <br />the county's average of approximately 2.3 persons/unit, a residential development of 426 units would <br />be anticipated to house approximately 980 people (2.3 X 426). For the subject request to meet the <br />county's adopted level of service standard of 1.97 cubic yards/person/year, the landfill must have <br />enough capacity to accommodate approximately 1,930 (980 X 1.97) cubic yards/year. <br />A review of the solid waste capacity for the active segment of the county landfill indicates the <br />availability of more than 800,000 cubic yards. The active segment of the landfill has a four year <br />capacity, and the landfill has expansion capacity beyond 2010- Based on the analysis, staff <br />determined that the county landfill can accommodate the additional solid waste generated by the site <br />under the proposed land use designation. <br />Stormwater Management <br />All developments are reviewed for compliance with county stormwater regulations which require <br />on-site retention, preservation of floodplain storage and minimum finished floor elevations. In <br />addition, development proposals must meet the discharge requirements of the county Stormwater <br />Management Ordinance. <br />The subject property is located within the M-3 Drainage Basin. Therefore, development on the site <br />would be prohibited from discharging any runoff in excess of the pre -development rate. For that <br />reason, development of this site would not increase downstream flooding for a 25 year/24 hour <br />design storm. <br />Although the minimum floor elevation level of service standards do not apply (because the property <br />does not tie within a floodplain), both the on-site retention and discharge standards apply. With the <br />most intense use of this site under the proposed amendment, the maximum area of impervious <br />surface would be approximately 3,711,312 square feet, or 852 acres. The maximum runoff volume, <br />based on that amount of impervious surface and the 25 year/24 hour design storm, would be <br />approximately 3,909,876 cubic feet. In order to maintain the county's adopted level of service, the <br />applicant would be required to retain approximately 1,299,373 cubic feet of runoff on-site. With the <br />soil characteristics of the subject property, it is estimated that the peak pre -development runoff rate <br />is 176.2 cubic feet/second. <br />November 13, 2001 <br />31 <br />