Laserfiche WebLink
Changes to the RM -4 zoning district criteria are <br />** <br />*** <br />shaded <br />Using the 25 setback from the wetland will provide a greater than 50' setback from the MHWL for the majonty <br />of the lots. Therefore. the environmental planning staff is recommending that the waiver be approved. The <br />three lots that need the waiver are lots 9 10, and 11. <br />The 8' frontyard setback applies only to side and rear loaded garages. Front loaded garages and principal <br />residences will be set back 25'. <br />The 5' sideyard setback applies only on the front 50 of the lot and applies only to garages and guest houses. <br />Any principal residence located on the front 50' will need to meet a 12' sideyard setback. All structures set <br />back 50', will require the 12' sideyard setback. <br />**** Decks and other accessory structures can go within 5' of the upland buffer line. <br />NOVEMBER 14, 2000 <br />-92- <br />BKL16PG!04 <br />Description <br />RM -4 Criteria <br />Lots 1 - 20 <br />Parcel A <br />(Lagoon <br />shoreline) <br />Lots 21 - 27 <br />Parcel B <br />(Marina -front) <br />Lots 28 - 33 <br />Parcel C <br />(Interior) <br />Lot Size <br />10,000 sq. ft. <br />10.000 sq. ft. <br />10.000 sq. ft. <br />7,700 sq. It <br />Lot Width <br />80' <br />80' <br />80' <br />70' <br />Frontward <br />Setback <br />25' <br />8/25'*' <br />8' <br />Rearyard <br />Setback <br />10' <br />25' <br />10' from u land <br />I (1' <br />buffer***' <br />Sideyard <br />Setback <br />► '' <br />10' <br />571'2'4-4' <br />3' <br />Minimum <br />Right -of -Way <br />Width <br />50' <br />MI <br />ED <br />ED <br />Indian River' <br />Lagoon Setback <br />50' from MHWL <br />50' from MHWL <br />25'* from <br />50' from MHWL <br />wetland <br />houndary <br />Side Lot <br />Driveway <br />Setback <br />2' <br />2' <br />2' <br />0 <br />Driving Aisle <br />N/A <br />22' <br />N/A <br />18 <br />Changes to the RM -4 zoning district criteria are <br />** <br />*** <br />shaded <br />Using the 25 setback from the wetland will provide a greater than 50' setback from the MHWL for the majonty <br />of the lots. Therefore. the environmental planning staff is recommending that the waiver be approved. The <br />three lots that need the waiver are lots 9 10, and 11. <br />The 8' frontyard setback applies only to side and rear loaded garages. Front loaded garages and principal <br />residences will be set back 25'. <br />The 5' sideyard setback applies only on the front 50 of the lot and applies only to garages and guest houses. <br />Any principal residence located on the front 50' will need to meet a 12' sideyard setback. All structures set <br />back 50', will require the 12' sideyard setback. <br />**** Decks and other accessory structures can go within 5' of the upland buffer line. <br />NOVEMBER 14, 2000 <br />-92- <br />BKL16PG!04 <br />