My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/2001
CBCC
>
Meetings
>
2000's
>
2001
>
11/6/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 6:20:49 PM
Creation date
9/25/2015 4:30:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
11/06/2001
Archived Roll/Disk#
2549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On January 9, 2001 , the Board of County Commissioner ' s approved the overall Supervisory <br /> Control and Data Acquisition System ( SCADA) plan for the Water Production and Distribution <br /> System . This system is a single comprehensive, Countywide water production SCADA System <br /> to serve the County ' s Water Production and Distribution Division . As part of two earlier Agenda <br /> Items , the Board of County Commissioner ' s approved Staff to proceed with Phases I and H of the <br /> plan , which dealt with both the North and South County Reverse Osmosis Water Treatment <br /> Plants (see attached Agenda Items dated 03 /01 /01 and 12/05 /00) . <br /> ANALYSIS <br /> Phase II is nearing completion . The remaining portion of Phase II is nearing completion by the <br /> Countys ' Computer Services Division . Staff is prepared to proceed with phase III of the project, <br /> as out lined in the earlier agenda items and the diagram below . The estimated cost for Phase III is <br /> $48 , 500 . The overall SCADA plan/budget as outline for the project and approved by the Board, <br /> is under budget and the scope has not changed . As outlined below, $44, 100 of the $48 , 500 is for <br /> system hardware ( items A thru F) . These items will be supplied under work authorization #3 <br /> with ROCHA Controls Inc . in the amount of $44 , 100 . <br /> As part of the implementation of the system staff has requested that a radio survey of the radio <br /> frequency and existing equipment be conducted . The system is currently experiencing minor <br /> intermittent signal disruptions , which results in a loss of system communication between the two <br /> Water Plants . The survey will determine the source and correct counter measures to be taken to <br /> address the signal interruptions . Staff has been provided with a scope of services under Work <br /> authorization #4 with ROCHA Controls Inc . in the amount of $ 5000 to conduct the survey . It is <br /> staff intention to utilize apportion of the projects ' contingency to fund the radio survey . The <br /> current amount available as project contingency is $ 18 , 326 (Phase I : $ 3766 + Phase II : $ 10 , 160 + <br /> Phase III : $4400 = $ 18 , 326) . <br /> System <br /> Upgrade <br /> System Upgrade / Phase Description Estimated Actual <br /> Priority !' P <br /> Phase Costs (S) Cost (S) <br /> Phase I . NORTH COUNTY REVERSE OSMOSIS <br /> ➢ Upgrade the Human Machine Interface (HMI ) terminal and software with the latest version <br /> of Rockwell Software ( RS- VIEW) for the North County RO. High Service Pumps station. <br /> Currently, the existing terminal and software is not compatible with other plant (North and <br /> South Reverse Osmosis ) systems . <br /> A . Equipment, programming, and startup services for replacement of the Existing HMI at North <br /> County Reverse Osmosis . (Estimated Cost $ 13 , 134 - <br /> R&R Fund) 513,134 .00 <br /> B . Remove existing Panel view monitor and modify control panel for new Unit converts existing <br /> application and integrate plant wide screens. (Estimated Cost $4,950 - R&R <br /> Fund ) <br /> $4,950 . 00 <br /> r Miscellaneous Computer hardware and periphery upgrades as determined by Computer Services Dept <br /> (Estimated Cost $25,000 — 50% Capacity Charge Fund / 50% R& R) <br /> ➢ Contingency at approximately 10% to be utilized as approved by the Director of Utilities. $25, 650.00 <br /> Total Estimated Cost (rounded) <br /> Phase Q. MAIN PLANTS - $47,500 $43, 734 . 00 <br /> ➢ Upgrade the six (6) System HMI packages to latest version Allen Bradlev — RS — View Software . The <br /> current software version being utilized is 6 .00 . 41 . The current and latest revision is 6. 30. This software <br /> upgrade will eliminate some nuisance errors currently being experienced by the operators . <br /> Estimated Cost (b .x $2 ,350 = $ 17 , 100 - R& R Fund) $77, 100. 00 <br /> i Upgrade the telephone leased lines modems at both plants to handle a high transfer rate to 19,200 bites <br /> per second (BPS ). The current modems are 9600 BPS . This upgrade will reduce plant operator's <br /> system watt time. <br /> Estimated Cost (2 x $ 1 ,310 = $2 ,620 - R&R Fund) $2, 620 .00 <br /> Add Allen Bradley communication modules (computer cards) at both plants to bridge the independent <br /> Data Highway (DH) networks . <br /> Estimated Cost (2 x $3, 410 = $6, 320 - Capacity Charge Fund) $6,820. 00 <br /> i ,Merge North and South Reverse Osmosis HMI applications (computer screens) to provide control of <br /> _ both plants from either location_ <br /> Estimated Cost ! '- x $20 ,000 = .540,000 - Capat. it, Charge Fund) <br /> NOVEMBER 6 , 2001 <br /> b E <br /> t t_ Edi i 1} <br /> - 94 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.