My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/2001
CBCC
>
Meetings
>
2000's
>
2001
>
11/6/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 6:20:49 PM
Creation date
9/25/2015 4:30:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
11/06/2001
Archived Roll/Disk#
2549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIM <br /> Other tasks suggested are restoration of the classroom located on the second level in the southeast <br /> corner of the building , and it is recommended that appropriate survey work be ordered to make sure <br /> of specific improvement and locations of various structures and easements . Money has also been <br /> assigned to obtain appropriate signage for the project . Utility impact fees have been calculated and <br /> it is recommended that they be paid at the time the building is to be connected to both water and <br /> sewer. <br /> Finally , an amount of funding has been set aside for needed design needs whether they be engineer- <br /> ing type of design or architectural . <br /> Should the Board support this plan of action, staff must contact the State for modifying the expen- <br /> ditures proposed from those shown on the original grant form . The specific change would be the <br /> deferring of the construction of an elevator at this time . <br /> The figures shown below show the original balance and the expenditures and proposed expend*- <br /> tures with proposed balances . <br /> Moore Grant SOS Grant <br /> $ 1501000 . 00 Beginning Balance $ 116 , 000 . 00 Beginning Balance <br /> $ (20, 000. 00) Dean 's Fee $ (224. 00) Signs In A Day <br /> $ ( 13. 972. 50 ) Roof $ ( 11250. 00) Enery Coatings <br /> $ 116, 027. 50 Balance Remaining $ (545. 00) Enery Coatings <br /> Proposed Tasks $ (275. 00) Enery Coatings <br /> $ ( 70 , 266 . 00 ) Soffit Work $ ( 19. 51) Eckerds <br /> $ ( 22 , 000 . 00 ) Brick Work $ ( 10. 35) Wal Mart <br /> $ ( 12 , 000 . 00 ) Design Fees $(42, 331 . 00) Clearshield <br /> $ ( 2 , 000 . 00 ) Surveys $ 71 , 345 . 14 Balance Remaining <br /> $ ( 3 , 000 . 00 ) Drainage Proposed Tasks <br /> $ ( 6 , 700 . 00 ) Classroom $ ( 14 , 008 . 00 ) Impact Fees <br /> $ ( 115 , 966 . 00 ) Total Proposed $ (44 , 800 . 00 ) Auditorium <br /> $ (4 , 500 . 00 ) Remove Stairs <br /> $ 61 . 50 Proposed Balance $ ( 2 , 016 . 00 ) Remove Boiler Room <br /> $ ( 2 , 400 . 00 ) Classroom <br /> $ ( 2 , 500 . 00 ) Repair East Entry <br /> $ ( 1 , 000 . 00 ) Signs In A Day <br /> _$ (71 , 224 . 00 ) Total Proposed <br /> $ 121 . 14 Proposed Balance <br /> RECOMMENDATION : <br /> Staff recommends that the Board authorize the improvements as discussed based on the funding <br /> availability and that staffbe authorized to request modifications to the grant to allow changes in the <br /> proposed improvements as outlined along with a request to extend the grant period to accommo - <br /> date the outlined improvements . Tasks in excess of the bid limit of $ 5 , 000 shall be bid . Tasks less <br /> than the bid minimum may be secured through appropriate Purchase Order processes . <br /> NOVEMBER 6 , 2001 U , 01.1 ill <br /> lip 36 <br /> - 74 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.