My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2000
CBCC
>
Meetings
>
2000's
>
2000
>
12/12/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 4:30:59 PM
Creation date
9/25/2015 5:47:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
12/12/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.C. STORM SHUTTERS FOR OLD FELLSMERE SCHOOL <br />BUILDING - CLEARSHIELD OF INDIAN RIVER COUNTY <br />The Board reviewed a Memorandum of December 6, 2040: <br />DATE: December 6, 200p <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THRU: James E. Chandler, County Administrator <br />FROM: Thomas W. Frame, General Services Director r �' �.. , <br />SUBJECT: Storm Shutters for Oid Ftllsmert School Building <br />BACKGROUND: <br />With the County's assumption of the Fellsmere School Grant and the lease of the building through the <br />interlocal agreement with the City of Fellsmere, the County needs to proceed with sealing the building <br />from the natural elements. Besides the roof, one of the areas where the weather is penetrating the <br />building is through windows where vandals have thrown rocks through the individual panes. The number <br />of broken panes continues to grow and will likely continue until such time as action is taken to prevent <br />such damage. <br />Placing clear type storm shutters would stop the continued vandalism and increase the long-term safety of <br />the building and its contents from potential storm related activities. Presently, there is only one vendor <br />for the clear hurricane shutters. That vendor is ClcarShietd of Indian River County, Inc. This is the same <br />vendor we utilized for the placement of the clear shutters on the County Administration Building. The <br />gresidcnt of the company has offered the same price on the shutters for the old school building as was <br />charged for the installation of the shutters here. That price with a 15%discount is 57.65 per square foot. <br />For the number of windo�ti•s an the Fellsmere School House, the price would be $42,331 including IiR <br />rental and additional ladders for the multiple floors. <br />Should the County seek to obtain sealed bids for these shutters. it would take 4� to 60 more days at the <br />earliest before a bid could be awarded and work commenced. By that time, much more damage could be <br />dare to the windows. Because ClearShield is the only provider within this area, it is not anticipated chat <br />there would be any other bidders nor a mare competitive Brice. The only outcome would be a time delay <br />and more broken windows. <br />Mr. Rav Ground, President of ClearShield of Indian River Cauntti•, has assured me that he can get in and <br />get the work done before the end of the calendar year. <br />RECOMMENDATION: <br />Based on the preceding comments, staff recommends that the Board waive the normal bidding procedures <br />and authorize ClearShield of Indian River County to proceed as a sale source provider far an amount not <br />to exceed $42.331. <br />December 12, 2UOU <br />1 �' BK � i � PG 4 � i <br />
The URL can be used to link to this page
Your browser does not support the video tag.