My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/2001
CBCC
>
Meetings
>
2000's
>
2001
>
12/4/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 4:26:31 PM
Creation date
9/25/2015 4:32:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
12/04/2001
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.H.2. SEA CREST MEDICAL OFFICES WATER MAIN <br />CONSTRUCTION - DEVELOPER'S AGREEMENT WITH <br />VANCE HOUDYSHELL OF EDDY GROUP, INC. <br />The Board reviewed a Memorandum of November 14, 2001: <br />DATE NOVEMBER 14, 2001 <br />TO: JAMES E. CHANDLER <br />COUNTY ADNIIIVISTRr1TOR <br />FROM W ERIK OLSON, P <br />DIRECTOR OF ILIT VICES <br />PREPARED GORDON E. SPARKS, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT DEVELOPER'S AGREEMENT FOR SEA CREST MEDICAL OFFICES <br />WATER MAIN CONSTRUCTION <br />Mr. Vance Houdyshell of the Eddy Group, Inc. is constructing a 14,400 square -foot Sea Crest Medical <br />Offices building on the east side of US 1 in Sebastian across from Wal-Mart. In order to service the <br />complex, an 8" diameter water main is required to be constructed from an 8" water main to be located <br />150 feet south of the project by another development (Fountain Towers, LLC Medical Office building) <br />(see Exhibit "C" of attached developer's agreement). The water main will further be extended across <br />the front footage of the project to its north property line, a distance of 327 feet (477 feet total length of <br />water main construction for this developer's agreement) The proposed water main construction will <br />allow future looping of the water main to master plan facilities in Roseland Road to the north. <br />Attached is a proposed developers agreement with Mr. Houdyshell for reimbursement of a portion of <br />the subject water main. The Developer's Agreement is stipulated to reimburse the Developer for the <br />County's share of the water main upon acceptance by and dedication to the County (Sec. — 1.A and <br />1B. of attached agreement) <br />The water main installation will comprise constructing approximately 477 linear feet of 8" water main <br />on the east side of US 1 from the north property line of the Fountain Towers, LLC Medical Office <br />building to the north property line of the proposed Sea Crest Medical Offices building. Mr. Houdyshell <br />has agreed to enter into a cost sharing agreement with the County to construct the water main in <br />conjunction with the site development <br />DECEMBER 4, 2001 <br />-110- <br />- r) <br />
The URL can be used to link to this page
Your browser does not support the video tag.